More Focus – Page 288
-
Features
The tracker: Calm before the storm?
The industry is bullish in the face of the volatile financial market but the residential sector is expected to feel the pressure soon. Experian Business Strategies reports
-
Features
Improving internal performance
Morgan Ashurst finds ways to improve SHE including the reduction of waste
-
Features
Wind turbine for primary school
Miller included a wind turbine, PVCu-free cabling and rainwater harvesting on Middlestone Moor school
-
Features
Sustainable Dalby visitor centre
Miller construction builds fully recyclable timber building in North Yorkshire
-
Features
Operation landfill
Reducing construction waste makes economic sense and is good for the environment but what should the industry be aiming for? Wrap and ºÃÉ«ÏÈÉúTV gathered together a group of industry experts to discuss whether the goal of halving construction waste to landfill by 2012 is achievable and how it might be ...
-
Features
Naturally ventilated utility headquarters
Miller Construction designs and constructs the new Yorkshire Water headquarters
-
Features
Low energy building in Edinburgh
Miller Construction built City of Edinburgh Council Chambers with low embodied energy, C02 and waste
-
Features
Excellent BREEAM rating at school
Miller Construction achieved green rating at Hagley Haybridge High School in Worcestershire.
-
Features
Very good BREEAM rating for college
Vinci applied sustainable principles to buildings at Wood Green High School College of Sport
-
Features
Hademore level crossing
Use of pulverised fuel ash by Vinci in replacement of a railway level crossing by a road bridge
-
Features
Green roofs at Bromley school
Vinci built the new Bishop Justus secondary school in Bromley to a high environmental spec
-
Features
Eco-Learning Village in Croydon
Vinci aimed for environmental efficiency in new teaching buildings
-
Features
Shell Centre Tower water reduction
SPIE Matthew Hall worked with supply chain in refurb to reduce services water use
-
Features
Shell Centre Tower waste reduction
ISG and SPIE Matthew Hall used segregation to reduce waste going to landfill at 26-storey building.
-
Features
Off-site uni build
Morgan Ashurst has used off-site manufacturing for University of Manchester building
-
Features
Engaging school children on PFI
HBG employed a Learning Resource Coordinator to engage with community in Bromsgrove PFI scheme
-
Features
Remediation of land in Cardiff Bay
Taylor Woodrow worked on the scheme for the sustainable remediation of a 33ha site.
-
Features
Oils captured by nappies
Contractor Barhale used 'plant nappy' to capture contaminating oils at water reservoir
-
Features
Efficient sewerage scheme in Kenilworth
Barhale installedan efficient sewage tunneling system that overcame the challenge of soft soil.
-
Features
The outdoors type
Jon Emery, the man behind Hammerson’s redevelopment of the Birmingham Bullring, is repeating the trick in Bristol and Leicester. He tells Lucy Handley why the era of the indoor out-of-town shopping centre is over and why he doesn’t enjoy spending time at Bluewater