All Offsite products articles – Page 2

  • Some 660m2 of Kawneer’s off-site curtain walling system has been used on the 12-storey Sheraton Athlone Hotel in Co Westmeath, Ireland
    Features

    Curved curtain walling

    2009-03-25T00:00:00Z

    Some 660m2 of Kawneer’s off-site curtain walling system has been used on the 12-storey Sheraton Athlone Hotel in Co Westmeath, Ireland. Specified by Murray O’Laoire Architects, Kawneer’s AA201 unitised system was adapted and used on two elevations

  • Stormking, the grp building products specialist, has added a range of chimneys to its portfolio of prefabricated products
    Features

    Ready-made chimneys

    2009-03-25T00:00:00Z

    Stormking, the grp building products specialist, has added a range of chimneys to its portfolio of prefabricated products. They are designed as visual features and are intended to provide a traditional detail for public and private housing

  • SpeedDeck has launched an insulated structural cassette roofing system called SpeedForm
    Features

    Roof cassettes

    2009-03-25T00:00:00Z

    SpeedDeck has launched an insulated structural cassette roofing system called SpeedForm

  • Features

    Off-site school building

    2009-03-25T00:00:00Z

    Yorkon has completed a building for Christ College in the Brecon Beacons National Park – one of Britain’s oldest educational establishments – in just five months

  • Features

    Cladding for airport stands

    2009-03-25T00:00:00Z

    ºÃÉ«ÏÈÉúTV envelope specialist Lakesmere has come up with an off-site solution for two stands at Heathrow airport. The Airbus A380 has two decks of passenger seating and an extra wide body, which means it cannot be accommodated at any of the existing stands at the airport

  • Features

    Timber-frame accommodation

    2009-03-25T00:00:00Z

    Zed Factory has produced the LandArk, a timber-framed structure that swoops up like a ship’s hull to provide outdoor storage space

  • Yorkon achieves ISO 14001
    ºÃÉ«ÏÈÉúTV

    Yorkon achieves ISO 14001

    2008-11-07T11:22:00Z

    Off-site specialist receives the internationally recognised green standard

  • Features

    Flatpack schools: St Agnes primary school, Manchester

    2008-09-12T00:00:00Z

    No need for wishful thinking: using solid timber panels as a construction material will bring speed and sustainability to the government’s school building programme. Stephen Kennett looks at a down-to-earth solution

  • Foremans brochure
    ºÃÉ«ÏÈÉúTV

    Green guide launched for pre-owned modular buildings

    2008-09-05T12:24:00Z

    Foremans says the use of recycled modular buildings is an environmentally sound alternative

  • Features

    Roof panel system

    2008-06-20T00:00:00Z

    RK Timber Engineering, a Saint-Gobain company, has partnered with Barratt Developments to provide Smartroof integrated roofing for its Green House at BRE.

  • Bovigo school’s early learning centre, with its secoya cladding and lime render, was no more expensive to build than a conventional structure, but has much higher specifications
    Features

    Modular straw panels

    2008-06-20T00:00:00Z

    Architect Martin Penk explains why the straw bale modular system was the right solution for Bosvigo school’s early years facility

  • Features

    Timber frames

    2008-06-20T00:00:00Z

    Timber frames from Prestoplan have been used in the construction of 10 six-storey apartment blocks for Bryant Homes on the banks of the River Mersey in Runcorn.

  • Features

    Unitised facades

    2008-06-20T00:00:00Z

    Hydro ºÃÉ«ÏÈÉúTV Systems has announced that its Wicona unitised facade system has exceeded the test requirements for European and Centre for Window and Cladding Technology curtain walling standards.

  • Features

    Off-site low carbon technologies

    2008-06-20T00:00:00Z

    Kingspan Off-Site has launched a collection of low-carbon technologies originally specified on the Kingspan Lighthouse, the first house to reach level six of the Code for Sustainable Homes.

  • Features

    Modular construction: How to build a hospital in a hurry

    2008-06-20T00:00:00Z

    Yorkon has completed the construction of a Procure 21 project for Interserve Project Services at the University Hospital of North Tees in Stockton.

  • Features

    Bespoke pipes

    2008-06-20T00:00:00Z

    The structured-wall plastic pipe can be made in diameters up to 2.1m in 6m lengths, with each solution designed to match the individual project.

  • The panels being fixed in position
    Features

    Off-site manufacture: Beam me up, Scotty

    2008-06-20T00:00:00Z

    Erecting a straw-bale school building in three days may sound like a frontier too far, but an innovative off-site manufacturing system using timber panels brought dramatic savings in time. Alex Smith reports

  • Features

    Bathroom pods

    2008-06-20T00:00:00Z

    The Care Range from Baudet is a collection of pods designed to meet the needs of the medical and care sector, including models for wheelchair users and those with impaired mobility.

  • Eurban’s solid timber panels are made in Germany from wood waste
    Features

    The alternatives: Modular systems

    2008-06-20T00:00:00Z

    Three more options for fast-track sustainable modular construction

  • Features

    Timber-frame system

    2007-06-15T00:00:00Z

    Timber-frame maker Eleco Timber Frame’s system ElecoFrame has been specified by Hemlock Construction for use in The Gallery, an 82-flat development in Manchester.