All ºÃÉ«ÏÈÉúTV articles in Best Practice
View all stories from this issue.
-
Features
Wates staff work on local community projects
Wates works with specialist waste expert Hippowaste on ‘Grants up for Grabs' initiative
-
Features
Rochester prison reuses materials for new road
Wates uses materials from demolished buildings to construct car park and on-site roads
-
Features
'Cut and fill' at Rochester young offenders prison
Wates recycles existing spoil at the Rochester Temporary Custodial facility to optimise difference in gradient
-
Features
Sustainable redevelopment of Unilever House
Bovis Lend Lease helped refurbish Grade II listed building through sustainable measures including cutting waste and congestion
-
Features
Material reclamation on Woolwich Civic Offices demolition
Wates worked with demolition contractor to ensure materials are reclaimed with the minimal impact on cost or program
-
Features
Townmead Estate regeneration Scheme
Mansell wins contract on largest social housing scheme in Fulham
-
Features
Moon Court eco-housing scheme
Mansell contracted to construct sustainable apartments in Fetcham, Surrey
-
Features
Diverting waste from landfill
Costain contractor cut waste and CO2 on Morfa to Berwick Link Road
-
Features
Waste management on Bristol Water
Costain hired for construction, testing and commissioning of the Northern Relief Main
-
Features
Improving internal performance
Morgan Ashurst finds ways to improve SHE including the reduction of waste
-
Features
Wind turbine for primary school
Miller included a wind turbine, PVCu-free cabling and rainwater harvesting on Middlestone Moor school
-
Features
Sustainable Dalby visitor centre
Miller construction builds fully recyclable timber building in North Yorkshire
-
Features
Naturally ventilated utility headquarters
Miller Construction designs and constructs the new Yorkshire Water headquarters
-
Features
Low energy building in Edinburgh
Miller Construction built City of Edinburgh Council Chambers with low embodied energy, C02 and waste
-
Features
Very good BREEAM rating for college
Vinci applied sustainable principles to buildings at Wood Green High School College of Sport
-
Features
Hademore level crossing
Use of pulverised fuel ash by Vinci in replacement of a railway level crossing by a road bridge
-
Features
Green roofs at Bromley school
Vinci built the new Bishop Justus secondary school in Bromley to a high environmental spec
-
Features
Eco-Learning Village in Croydon
Vinci aimed for environmental efficiency in new teaching buildings
-
Features
Shell Centre Tower water reduction
SPIE Matthew Hall worked with supply chain in refurb to reduce services water use
-
Features
Off-site uni build
Morgan Ashurst has used off-site manufacturing for University of Manchester building