Co-op Live builder鈥檚 links with club put it in frame for job

Bam has ruled itself of the race to build the 拢300m expansion to the Etihad stadium, clearing the path for frontrunner Sisk, which is already carrying out preliminary works at the site, to take on the job. 

Last month 好色先生TV revealed the treble-winning football club was on the hunt for a new contractor after it failed to agree a price with Laing O鈥橰ourke for the 8,000-seat expansion with Sisk, which was already lined up to carry out other work at the ground such as a new hotel, being installed as the favourite to take on the entire scheme.

IMG_0750

Source: Daniel Gayne

Sisk has begun preparatory work at the Etihad Stadium in east Manchester

As the contractor for the City Football Academy, as well as the Co-op Live Arena, which is on the Etihad campus and for which the club is a financial backer, Bam would have been well-placed for the job. 

But speaking at the topping-out ceremony for Co-op Live, Bam鈥檚 executive director James Wimpenny ruled that out. 

鈥淲e are not looking at that,鈥 he said. 鈥淲e have just got enough on with what we are already doing. Ultimately, you can take on too much and I think that job is going to start before [Co-op Live] finishes.鈥

Martin Horne, Bam construction director for the North West region, added: 鈥淔rom our perspective, there was too much of an overlap, I think in the two projects.  

鈥淚f they had been back-to-back then maybe a different view would have been taken.鈥

The decision clears the way for Sisk, which has previously built a number of stadia in Ireland and which is already understood to be in talks with the club.

Meanwhile, the joint venture behind the Populous-designed Co-op Live claim it will be the UK鈥檚 largest and most sustainable live entertainment arena when it opens its doors next April. 

The topping out ceremony was a transatlantic affair, with stars-and-stripes bunting and a mustard hot dog lunch reflecting the involvement of joint venture partner Oak View Group, an LA-based investment company focused on sports and live entertainment. 

>> 鈥楾he day I convince myself I know everything is the day I go鈥: an interview with Bam鈥檚 John Wilkinson

>> Bam in frame to replace stricken Claritas on City office

Hundreds of attendees were shown around the arena bowl before hearing speeches from Bam鈥檚 Wimpenny, as well as Oak View Group chief Tim Leiweke, City Football Group boss Ferran Soriano, Co-op director of marketing Amanda Jennings and mayor of Manchester, Andy Burnham. 

In his speech, Leiweke said the venue would 鈥減ut Manchester where its deserves to be鈥 in the global music stakes, noting how the city had in the past decade slipped from a top three global concert market to no longer being in the top 10.  

鈥淭hat is not a reflection of the music or audiences of Manchester, which are stronger than ever. It is a reflection on investment in cultural infrastructure,鈥 he said. 

IMG_0717

Source: Daniel Gayne

James Wimpenny speaking at the Co-op Live launch

Wimpenny said 80% of its construction orders had been placed with businesses in the North-west, meaning 拢200m of the 拢460m arena鈥檚 funding went back to the region. 

鈥淎longside my team at Bam, we鈥檝e brought onboard鈥386 local suppliers, 40% of which are based within鈥痜ive miles鈥痮f this鈥痙evelopment,鈥 he said.

The arena has been described by its backers as a 鈥渕usic-first鈥 venue, meaning it has been designed from the ground up with acoustics in mind. 

Horne added: 鈥淚t is quite unusual for a building like this to be designed primarily as a music venue 鈥 a lot of the other arenas in the UK are built either as sports venues or adaptations of existing buildings鈥. 

鈥淔rom an audio visual, digital acoustic perspective has been extremely challenging to build a big building with big open spaces, big open, three-story atriums but ensure that they acoustically do what they need to do.鈥  

The construction team, which reached 800 site staff at its peak, has also been faced with the challenges of a constrained site which is surrounded by a canal, tram station and the Etihad stadium鈥檚 car park. 

鈥淲hat would be really nice if we had 20 or 30 metres all the way around to access in and out of the building and build the cantilevers 鈥 we鈥檝e not got that,鈥 he said. 鈥淲hat we are essentially doing is building it inside out鈥. 

The opening next spring has been pushed back from the original plan to open it at the end of this year which Bam said stemmed from issues faced by the construction team on early stage groundworks.