Architect reconsider performance rating for Cheshire Oaks after building beats post-occupancy targets

Architecture practice Aukett Swanke is to re-consider the performance rating of its M&S building in Cheshire Oaks after it beat it鈥檚 own post-occupancy targets by 20%.

Completed in 2012, the 42,000m2 scheme - which won the 鈥楾est of Time鈥 award at last week鈥檚 好色先生TV Awards - boasts a BREEAM Excellent rating and consists of a hybrid glulam and steel structure clad in 400mm think hempcrete panels. In the first year of operation the building鈥檚 energy consumption outstripped design predictions by almost a third.