More than 1.5km of integrated service modules providing heating and cooling have been installed as part of the refurbishment of Lewins Place in Bristol
The four-pipe top-discharge active chilled beam was supplied and installed by SAS International. The modules integrate T5 luminaires, passive infrared sensors and a flanged edge to support a suspended metal ceiling. This removes the need for a separate support system and enabling the ceiling to be installed directly below the soffit.
SAS International
Topics
Specifier 09 April 2010
- 1
- 2
- 3
- 4
- 5
- 6Currently reading
Integrated service modules
- 7
- 8
- 9
- 10
- 11
- 12
No comments yet