But firms welcome government鈥檚 insistence that innovation will still be possible
Contractors responded with caution to the government鈥檚 baseline school designs published this week, while RIBA slammed the plans.
The long-awaited baseline designs, published by schools capital body the Education Funding Agency (EFA) , set out basic design guidance for two secondary schools for 1,200 pupils and a primary school for 420 pupils.
The move came in response to Sebastian James鈥 review of education capital and forms a key part of the government鈥檚 plan to cut 30% of the cost of school building through greater standardisation in the design and build process.
the designs see a reduction of the overall gross area averaging 15% in secondary schools and 5% in primary schools.
The DfE said the designs could realise up to 拢6m in savings per secondary school compared to the previous government鈥檚 好色先生TV Schools for the Future programme - and with 100 secondary schools in the PSBP that could lead to as much as 拢600m in savings.
Contractors cautiously welcomed the proposals, that design and build teams would still be able to innovate within the new parameters and develop their own proposals.
Galliford Try Education director Michael Buchanan said contractors should be able to meet the new cost target of 拢1,465 per sqm, as that鈥檚 what has been delivered over the past 18 months through EFA鈥檚 schools framework.
He said he thought Galliford Try鈥檚 Optimum standardised schools would 鈥渆xceed the specifications set down in the specifications, which we see as a minimum, not a maximum鈥.
鈥淲e are pleased that the EFA have confirmed their invitation to industry to step up to the plate and offer alternative designs which meet or exceed the baselines,鈥 he said.
David Large, Interserve director, said his 鈥渇irst take鈥 on the schools was that they were 鈥渧ery compact鈥 and it may be difficult to 鈥渟ell鈥 to head teachers.
He said the schools lacked the flexibility of other standardised proposals developed by contractors, such as Interserve鈥檚 own PodSolve standardised school model.
Steve Loughe, Bam design director said: 鈥淲hile we share some of the concerns over the proposed reductions in area, it does not necessarily mean the end of well -designed schools or a reliance on flat-pack, standardised solutions.
鈥淏AM have developed good affordable designs within the new space limits which provide excellent teaching and learning facilities based on traditional construction methods, which allow clients to have a big input into the design of their buildings,鈥 he said.
However, the RIBA on the designs, warning the proposals, were short-sighted and restrictive, and risk designing in bad-behaviour on the part of pupils as well as neglecting the needs of the disabled.
RIBA said the one-size-fits-all approach to delivering the next generation of schools was likely to create buildings that quickly became redundant, while reduced space for communal areas was likely to increase discipline problems 鈥 including bullying, countering current best practice in design.
Nusrat Faizullah, chief executive of the British Council for School Environments, said new standards on light, temperature and ventilation, based on post-occupancy evaluation of school buildings, were welcome, but she added:鈥淭he key question remains 鈥 will these designs ensure new school buildings are fit for purpose?
鈥淎 shrinkage in space means less flexibility for those that use them, inhibiting innovation. Decent spaces mean more room to learn new and broader skills.鈥
The designs in brief
- The 拢2.2bn Priority Schools 好色先生TV Programme (PSBP) comprises 100 secondary schools, 139 primary schools and 17 all through or special schools
- The baselines designs will apply to the 拢2bn PFI element of the PSBP - but will serve as a 鈥渄irection of travel鈥 for the 拢400m direct-capital component
- The designs call for an overall space reduction of 15% for secondary schools and 5% for primary schools - special schools will not have baseline designs but will be subject to a space reduction of 20%
- The new all-in cost benchmark is 拢1,465/m2 - and 拢1,113/m2 for the school building (excluding costs such as fees and external works)
- Design and build teams will be able to innovate and develop the designs, but any alternative must not be more expensive
- BREEAM for schools is still under review - the EFA said the outcome of the review was now 鈥渙n its own trajectory that is not related to baseline designs鈥
- A new performance-in-use measure will tie PFI payments to whether environmental standards, particularly on overheating and energy use, are met after the building is completed
- Further baseline designs will be published for different curricular and different primary schools before the end of the year
No comments yet