All Education and healthcare articles – Page 98
-
Features
Under their wings
Ryder HKS’s Darlington Education Village brings together the least able children, including those with severe behavioural difficulties, and the most academic – an architectural and curatorial challenge that has been met with verve. Not bad for a PFI project
-
Comment
Educations what you need
In addition to the ideas listed in your article, can I suggest that creating awareness of energy use and waste through energy handbooks could contribute to erergy savings?
-
Features
Cost model: School extensions
While Blair's shiny new city academies grab all the headlines, a host of smaller-scale improvements to existing schools is quietly being carried out. In the first of our series of mini-cost models, Max Wilkes of Davis Langdon reviews the key issues and costs involved in primary school extension projects
-
ɫTV
Playing on the roof
ɫTV Design Partnership has designed this £27m academy for a tiny site in Hackney, east London.
-
ɫTV
Reflected glory
This gleaming £29m hub for Liverpool University’s engineering department has been designed by Sheppard Robson.
-
Comment
An education in form filling
You report that the education sector may be about to embrace an “NHS Procure21-style” strategy for the procurement of its buildings (6 May, page 11).
-
ɫTV
Schools & hospitals: Election Battleground no2
Ambitious programmes of school and hospital building have been cornerstones of the Labour governments education and health policies. ɫTV casts a critical eye over how successful those multibillion-pound programmes have been, looks at the key manifesto pledges of the three main parties and finds out what surveyors think of the ...
-
Features
University of Hertfordshire campus
The University of Hertfordshire is no stranger to innovation, as its de Havilland campus demonstrates.
-
Features
Lifetime costs: educational buildings
School-building is booming, thanks to the PFI – and firms now have to build with best value rather than lowest price in mind. Peter Mayer of ɫTV Performance demonstrates how to cost a school's whole life
-
Features
Cost study: Chemistry building, Queen Mary University
The design of a laboratory is an exercise in technical virtuosity married to an understanding of the social dynamics of a community of undergraduates and researchers. Architect Sheppard Robson, QS Turner & Townsend and contractor Geoffrey Osborne tackled one such demanding brief at Queen Mary University in London – here’s ...
-
Features
Richard Rogers' Japanese school: Dream school
An elegant open-plan school beneath a sawtooth roof has been built in a Japanese village to designs by Richard Rogers Partnership
-
Features
Cost study: Max Perutz lecture theatre
The Laboratory of Molecular Biology in Cambridge had nowhere for its Nobel Prize-winning scientists to present their research. So architect Feilden + Mawson and quantity surveyor Keegans created an auditorium extension on stilts – and here they reveal the details of how it was done
-
Features
Cost model: 21st-century university building
The government wants 50% of 18-30-year-olds to be educated to degree level by 2010, and expects universities to compete in international research markets. So what buildings are required to help meet these objectives? In its latest cost model, Davis Langdon & Everest examines the 21st-century university building
-
Features
Cost study: Warwick University International Manufacturing Centre
Partnering and value engineering helped slice 5% off time and cost on the third phase of Warwick University’s International Manufacturing Centre. This Movement for Innovation demonstration project is reviewed by Warwick University, Edward Cullinan Architects and Northcroft
-
Features
Cost model: Britain's schools
The government’s investment of billions in Britain’s schools has raised the question of how that money can be spent most efficiently and effectively. Davis Langdon & Everest examines education from the point of view of policy and design, and gives cost breakdowns for two typical school building types
-
Features
Cost study: West Lothian College
A brand new campus developed on a greenfield site in Livingston, procured through PFI by trading in the former college site, was the best way to offer West Lothian College real value for money. HBG Construction and architect RMJM Scotland explain how they accommodated both traditional and high-tech styles – ...
-
Features
Cost model: Prefabrication and preassembly
How can prefabrication and preassembly deliver the buildings that clients and designers aspire to? In this cost model, Davis Langdon & Everest looks at case studies of recent applications of preassembly techniques
-
Features
Cost model: PFI projects
The government has swept aside opposition and committed itself to the use of the private sector in delivering public services. With private finance sure to have a growing role in the government’s building programme, it’s time to ask if PFI will be able to deliver. Davis Langdon & Everest reviews ...
-
Features
Cost study: Teaching and research facility
In the first completed PFI project in higher education, a listed Victorian hospital building was converted into an advanced teaching and research facility. The 25-year service contract called for detailed life-cycle costing of materials. Compiled by Jarvis and HLM Architects