Was this defence of design and build contradictory?
Stuart Pemble,, (8 May, www.building.co.uk), writes that: 鈥淭he advanced nature of the design at the time the contract is let is
key to the success of the D&B approach.
The design should effectively be sufficiently advanced for the project to be built.鈥
Then it isn鈥檛 D&B, surely?
Joseph Di Leo, via www.building.co.uk