We asked readers what buildings were futuristic in their time, or marked a change in how the industry built. Here, Jason Langer answers the question: what have the Romans ever done for us?

B175 logo 3 by 2

We don鈥檛 always have to look to the future to develop new and better ways of designing and constructing buildings; some great innovations lie deep in the past, and should still provide inspiration for us today.

We often say to our clients: 鈥淭he best temporary works are permanent works.鈥 This mantra underlines a desire to combine efficient structural systems with detailing that makes them simple and cost-effective to construct. Designing nirvana itself can be achieved if the buildable structural solution can be incorporated elegantly into the architectural concept. But how often does this actually happen?

Construction engineering in historic architecture

The truth is 鈥 the Romans were achieving it millennia ago. When next you look at classic structural forms such as the Colosseum in Rome, look closely at the little shelf detail at the base of every archway. It has been copied as an architectural detail a million times over since 鈥 in houses, churches, assembly halls, train stations, everywhere. Some might think it is there simply as an architectural relief detail to express where the structure transitions from vertical to arch form.  

In reality, it is a built-in piece of temporary works, designed to support the incomplete arch above, until the keystone is installed. That鈥檚 right - one of the most copied pieces of architectural detailing in the world, is a piece of temporary works engineering.  

It is possible to develop design solutions that are entirely driven by construction methodology. We shouldn鈥檛 hide from this challenge 鈥 we should embrace it and look to make tomorrow鈥檚 history.