- ºÃÉ«ÏÈÉúTV
All the latest updates on building safety reformRegulations latest
- Focus
- Comment
- Programmes
- CPD
- ºÃÉ«ÏÈÉúTV the Future
- Data
2024 events calendar
ºÃÉ«ÏÈÉúTV Awards
Keep up to date
- ºÃÉ«ÏÈÉúTV Boardroom
All the latest updates on building safety reform
2024 events calendar
ºÃÉ«ÏÈÉúTV Awards
Keep up to dateÌý | £/system |
X-ray MVTHR scanner | 200,000 |
CT examiner | 600,000 |
Network interface | 50,000 |
X-ray scanner (hand baggage) | 70,000 |
Tilt tray sorter complete | 10,000/m |
Make-up carousel | 75,000 |
Reclaim carousel | 90,000 |
All costs are net of builders’ work, preliminaries and professional fees. |
Ìý | £ | £/m2 GIFA | % |
Substructure | 4,307,000 | 172.28 | 6.02 |
Undercroft construction; reduced-level excavation, 200mm-thick reinforced concrete ground slab, hardcore, damp-proof membrane: 8,550m2 @ £300 | Ìý | Ìý | Ìý |
Ground slab; 200mm-thick reinforced insitu concrete bed, hardcore, damp-proof membrane: 1,050m2 @ £120 | Ìý | Ìý | Ìý |
Extra for retaining walls, linings etc: item @ £320,000 | Ìý | Ìý | Ìý |
Extra for foundations; isolated pad and raft foundations: 9,600m2 @ £105 | Ìý | Ìý | Ìý |
Allowance for below-ground drainage and incoming services: 9,600m2 @ £30 | Ìý | Ìý | Ìý |
Frame | 3,585,800 | 143.43 | 5.01 |
Allowance for structural steel framing based on 80kg/m2 (average rate for universal and hollow sections): 1,330t @ £2,300 | Ìý | Ìý | Ìý |
Allowance for structural steelwork to office mezzanine, based on 35kg/m2: 25t @ £1,950 | Ìý | Ìý | Ìý |
Allowance for additional framing/trimming to service risers and openings for baggage conveyors: item @ £160,000 | Ìý | Ìý | Ìý |
Cold-rolled galvanised steel roof purlins; 1.6m centres, 4.5kg/m average weight: 9,300m @ £10 | Ìý | Ìý | Ìý |
Intumescent 1hr fire-resistant paint finish: 15,000m2 @ £15 | Ìý | Ìý | Ìý |
Upper floors | 1,570,000 | 62.80 | 2.20 |
Prestressed, precast concrete structural suspended floor units; 50mm-thick structural topping: 14,800m2 @ £95 | Ìý | Ìý | Ìý |
Extra for 7.5kN/m2 floor loading to plant room areas: 500m2 @ £8 | Ìý | Ìý | Ìý |
Extra for formation of openings, lift and escalator pits etc: item @ £160,000 | Ìý | Ìý | Ìý |
Roof | 5,551,500 | 222.06 | 7.76 |
Roof cladding, including perforated feature cladding, raised-seam aluminium roofing, structural deck, insulation, vapour barrier and liner: 9,200m2 @ £285 | Ìý | Ìý | Ìý |
Extra for rooflights, with sealed double-glazed units, powder-coated aluminium framing and secondary steelwork including perforated panel sunscreens: 900m2 @ £950 | Ìý | Ìý | Ìý |
Allowance for work to boundaries, gutters, rooflights, openings etc: 7,500m @ £80 | Ìý | Ìý | Ìý |
Precast concrete roof slabs; 7.5kN/m2 floor loading, for roof-level plant, with waterproof membrane, plinths and bases: 450m2 @ £250 | Ìý | Ìý | Ìý |
Full-length entrance/set-down canopy, complete with hollow-section framing, curved aluminium raised-seam roofing, rooflights: 1,300m2 @ £900 | Ìý | Ìý | Ìý |
Allowance for roof safety system: 1,200m @ £160 | Ìý | Ìý | Ìý |
Stairs | 807,000 | 32.28 | 1.13 |
Steel feature stair and half-landings, overall rise 5.50m, with toughened, laminated glass balustrade, stainless steel handrails, finishes: 2 nr @ £40,000 | Ìý | Ìý | Ìý |
Steel feature stair, overall rise 3.00m, with toughened, laminated glass balustrade, stainless steel handrails, finishes: 2 nr @ £32,000 | Ìý | Ìý | Ìý |
Precast concrete stairs and half-landings, overall rise 5.50m, with stainless steel handrails, finishes: 2 nr @ £26,000 | Ìý | Ìý | Ìý |
Precast concrete stairs and half-landings, overall rise 5.50m, with polyester powder-coated steel handrails, finishes: 16 nr @ £20,000 | Ìý | Ìý | Ìý |
Balustrade and handrail to mezzanine and first floor with toughened laminated glass balustrade and stainless steel handrail: 190m @ £900 | Ìý | Ìý | Ìý |
Allowance for access platforms and stairs to plant rooms: item @ £100,000 | Ìý | Ìý | Ìý |
Allowance for roof access, stairs and hatches: item @ £20,000 | Ìý | Ìý | Ìý |
External walls, windows and doors | 6,840,200 | 273.61 | 9.57 |
Wall cladding; aluminium-faced composite panels with 25% glazing in aluminium-framed sealed double-glazed units, flashings and accessories: internal lining, including 140mm-thick blockwork backing wall: 7,000m2 @ £650 | Ìý | Ìý | Ìý |
Curtain walling; silicone-sealed double-glazed units, colour-coated aluminium framing, flashings and accessories: 1,750m2 @ £900 | Ìý | Ìý | Ìý |
Extra for shopfront feature curtain walling to entrance areas: 100m2 @ £400 | Ìý | Ìý | Ìý |
Extra for triple-glazing and increased depth of framing to airside curtain walling: 480m2 @ £240 | Ìý | Ìý | Ìý |
Louvre panels to plant areas, of powder-coated aluminium: 250m2 @ £400 | Ìý | Ìý | Ìý |
Principal entrance double doorsets (2 nr) and wind lobby, fully glazed with ironmongery and accessories: 6 nr @ £50,000 | Ìý | Ìý | Ìý |
Aluminium-faced powder-coated vision-panel double doors and frames, with ironmongery: 10 nr @ £10,000 | Ìý | Ìý | Ìý |
High-speed sectional doors to baggage handling, electrically operated, including controls: 4 nr @ £15,000 | Ìý | Ìý | Ìý |
Internal walls and partitions | 2,099,000 | 83.96 | 2.94 |
Insitu concrete shear walls to stair cores and service risers, 250mm average thickness: 2,500m2 @ £140 | Ìý | Ìý | Ìý |
Blockwork partitions, 140mm average thickness, with head restraint: 7,700m2 @ £60 | Ìý | Ìý | Ìý |
Metal stud partitions; 5.0m high, single-layer impact-resistant board, single-layer wallboard, each side, to public areas: 2,500m2 @ £80 | Ìý | Ìý | Ìý |
Metal stud partitions; double-layer wallboard, each side, to office areas: 1,050m2 @ £60 | Ìý | Ìý | Ìý |
Metal stud partitions; shaftwall construction, double-layer fireline board, single-layer core board, one side only: 2,000m2 @ £100 | Ìý | Ìý | Ìý |
Fascia panel to ticket sales desks: 40m @ £800 | Ìý | Ìý | Ìý |
Fully glazed shopfronts; fascia panel: 160m @ £3,200 | Ìý | Ìý | Ìý |
Toilet cubicle partitions: 50 nr @ £1,600 | Ìý | Ìý | Ìý |
Melamine-faced solid-laminate access panelling to WCs etc: 150 nr @ £800 | Ìý | Ìý | Ìý |
Allowance for additional screens and partitions: item @ £80,000 | Ìý | Ìý | Ìý |
Internal doors | 371,100 | 14.84 | 0.52 |
Flush doors to public areas, solid-core laminate/veneer-faced with hardwood frames and ironmongery: 100 nr @ £1,450 | Ìý | Ìý | Ìý |
Flush doors to administration areas, solid-core laminate/veneer-faced with hardwood frames and ironmongery: 72 nr @ £1,300 | Ìý | Ìý | Ìý |
Duct access doors: 100 nr @ £1,125 | Ìý | Ìý | Ìý |
Allowance for additional services access panels: item @ £20,000 | Ìý | Ìý | Ìý |
Wall finishes | 1,224,600 | 48.98 | 1.71 |
Independent wall lining; plasterboard lining to inner face of external walls: 4,600m2 @ £50 | Ìý | Ìý | Ìý |
Extra over plasterboard linings for laminate-finish wall panelling: 2,500m2 @ £15 | Ìý | Ìý | Ìý |
Laminate-finish wall panelling to blockwork: 3,700m2 @ £65 | Ìý | Ìý | Ìý |
Ceramic tiles with sand cement backing to concrete or blockwork: 300m2 @ £65 | Ìý | Ìý | Ìý |
13mm double-coat lightweight plaster and two coats emulsion paint to blockwork/concrete: 10,900m2 @ £20 | Ìý | Ìý | Ìý |
Two coats emulsion paint to blockwork: 6,650m2 @ £5 | Ìý | Ìý | Ìý |
Skim coat and two coats emulsion paint to plasterboard: 5,900m2 @ £12 | Ìý | Ìý | Ìý |
Wall protectors, stainless steel protective rails: 1,500m @ £250 | Ìý | Ìý | Ìý |
Floor finishes | 1,720,500 | 68.82 | 2.41 |
Sand cement screed, average 40mm thick: 10,040m2 @ £24 | Ìý | Ìý | Ìý |
Granite terrazzo floor tiles, 300 x 300mm, including allowance for skirtings, movement joints and brass division strips: 6,540m2 @ £130 | Ìý | Ìý | Ìý |
Vitrified ceramic tiles, 400 x 400mm, including allowance for skirtings and movement joints: 1,100m2 @ £95 | Ìý | Ìý | Ìý |
Raised access floor, carpet tile, to office areas: 800m2 @ £65 | Ìý | Ìý | Ìý |
Heavy-duty carpet tiles, including allowance for skirtings: 2,400m2 @ £45 | Ìý | Ìý | Ìý |
Vinyl floor tiles and levelling screed, including allowance for skirtings, to core areas: 2,550m2 @ £40 | Ìý | Ìý | Ìý |
Extra for finish to WCs: 400m2 @ £76 | Ìý | Ìý | Ìý |
Concrete hardener to concession shells, plant rooms and baggage handling, and skirtings: 10,300m2 @ £8 | Ìý | Ìý | Ìý |
Allowance for additional floor finishes: item @ £100,000 | Ìý | Ìý | Ìý |
Suspended ceilings, including metal pan tiles and lay-in grid, to check-in, ticket sales and office areas: 1,650m2 @ £65 | Ìý | Ìý | Ìý |
Suspended ceilings, including mineral-fibre tiles and lay-in tiles, to core areas: 440m2 @ £40 | Ìý | Ìý | Ìý |
Extra over ceiling finishes generally for acoustic treatment to mall/queuing areas: 6,000m2 @ £35 | Ìý | Ìý | Ìý |
Extra for moisture-resistant ceiling tiles to WC areas: 400m2 @ £10 | Ìý | Ìý | Ìý |
Concrete sealant to concession shells, plant rooms and baggage handling: 10,300m2 @ £10 | Ìý | Ìý | Ìý |
Extra for 4hr fire protection to areas of undercroft plant room soffit: 500m2 @ £100 | Ìý | Ìý | Ìý |
Furniture and fittings | 1,770,000 | 70.80 | 2.49 |
Check-in desks: 64 nr @ £5,000 | Ìý | Ìý | Ìý |
Out-of-gauge baggage counter: item @ £40,000 | Ìý | Ìý | Ìý |
Information and security desks: item @ £80,000 | Ìý | Ìý | Ìý |
Ticket desks: 20 nr @ £10,000 | Ìý | Ìý | Ìý |
Statutory and directional signage: item @ £240,000 | Ìý | Ìý | Ìý |
Seating to check-in and departure lounge areas: 400 nr @ £250 | Ìý | Ìý | Ìý |
Allowance for fixtures and fittings generally to public areas: item @ £320,000 | Ìý | Ìý | Ìý |
Allowance for furniture and equipment to check-in and ticket sales areas (excluding IT installations): item @ £320,000 | Ìý | Ìý | Ìý |
Allowance for fittings to back-of-house areas: item @ £150,000 | Ìý | Ìý | Ìý |
Sanitary fittings | 114,500 | 4.58 | 0.16 |
WCs, urinals, hand basins generally: 150 nr @ £650 | Ìý | Ìý | Ìý |
Allowance for fittings for disabled WCs: item @ £8,100 | Ìý | Ìý | Ìý |
Cleaners’ sinks: 6 nr @ £650 | Ìý | Ìý | Ìý |
Allowance for drinking-water fountains: item @ £5,000 | Ìý | Ìý | Ìý |
Disposal installations | 445,000 | 17.80 | 0.63 |
Rainwater disposal, including cast-iron downpipes and fittings: 25,000m2 @ £6 | Ìý | Ìý | Ìý |
Waste, soil and vent installation, including uPVC pipework and fittings: 25,000m2 @ £8 | Ìý | Ìý | Ìý |
Allowance for pumped disposal from undercroft: item @ £95,000 | Ìý | Ìý | Ìý |
Water installations | 450,000 | 18.00 | 0.63 |
Hot and cold water service, including calorifiers, hot and cold water storage and distribution: 25,000m2 @ £18 | Ìý | Ìý | Ìý |
Space heating and air treatment | 9,610,900 | 384.44 | 13.52 |
Gas installation: item @ £32,000 | Ìý | Ìý | Ìý |
Low-temperature hot water heating (boiler plant), including stainless steel flues, pumps and valves, distribution within plant rooms, insulation: 25,000m2 @ £24 | Ìý | Ìý | Ìý |
Low-temperature hot water heating (perimeter heating), including LTHW elements and distribution: 25,000m2 @ £38 | Ìý | Ìý | Ìý |
Chilled water installation, including chillers and cooling towers (total load 2,500kW), pressurisation unit, pumps and valves, distribution pipework, insulation and trace heating: 25,000m2 @ £64 | Ìý | Ìý | Ìý |
Supply and extract ventilation: air-handling unit with heating and cooling batteries; ductwork in risers and plant rooms: 25,000m2 @ £32 | Ìý | Ìý | Ìý |
Supply and extract ventilation: displacement system; ductwork, grilles and diffusers, insulation; to public areas: 13,500m2 @ £290 | Ìý | Ìý | Ìý |
Air-conditioning: four-pipe fan-coil installation to office areas, check-in etc; LTHW and chilled water distribution, condensate drainage, fan-coil units, ductwork, insulation, grilles and diffusers: 1,650m2 @ £250 | Ìý | Ìý | Ìý |
Allowance for services to comms rooms: item @ £240,000 | Ìý | Ìý | Ìý |
Mechanical ventilation to baggage handling and plant rooms: 7,400m2 @ £80 | Ìý | Ìý | Ìý |
Toilet extract installation: 25,000m2 @ £8 | Ìý | Ìý | Ìý |
Allowance for smoke extract to public areas, roof-level extract: 13,500m2 @ £10 | Ìý | Ìý | Ìý |
Extra over mechanical ventilation for smoke extract to baggage handling: 4,200m2 @ £32 | Ìý | Ìý | Ìý |
Electrical installations | 6,913,800 | 276.55 | 9.72 |
HV switchgear, 5mVA, transformers, HV cable, LV switchgear: item @ £1,600,000 | Ìý | Ìý | Ìý |
Standby generation (1,750kVA) for essential services only: item @ £800,000 | Ìý | Ìý | Ìý |
Mains and sub-mains installation: 25,000m2 @ £46 | Ìý | Ìý | Ìý |
Small power distribution: 25,000m2 @ £16 | Ìý | Ìý | Ìý |
Lighting and luminaires to public areas: 13,500m2 @ £120 | Ìý | Ìý | Ìý |
Lighting and luminaires to check-in, ticket sales and offices: 1,650m2 @ £90 | Ìý | Ìý | Ìý |
Lighting and luminaires to core, plant and baggage handling: 9,850m2 @ £65 | Ìý | Ìý | Ìý |
Emergency lighting installation: 25,000m2 @ £15 | Ìý | Ìý | Ìý |
Power to mechanical services: item @ £180,000 | Ìý | Ìý | Ìý |
Lift installations | 1,260,000 | 50.40 | 1.77 |
26-person, 0.6m/s electro-hydraulic lift serving 2 floors: 2 nr @ £150,000 | Ìý | Ìý | Ìý |
2,000kg goods lift serving 3 floors: 2 nr @ £160,000 | Ìý | Ìý | Ìý |
Escalator, 0.5m/s, 1m step-width, 5.2m rise, glass balustrade: 4 nr @ £160,000 | Ìý | Ìý | Ìý |
Protective installations | 1,210,000 | 48.40 | 1.70 |
Lightning protection: 25,000m2 @ £3 | Ìý | Ìý | Ìý |
Earthing and bonding: 25,000m2 @ £5 | Ìý | Ìý | Ìý |
Sprinkler installation, with storage tank, pumps and pipework: 25,000m2 @ £32 | Ìý | Ìý | Ìý |
Allowance for dry-riser and hose-reel installations: item @ £160,000 | Ìý | Ìý | Ìý |
Fire-suppression installation to comms room: item @ £50,000 | Ìý | Ìý | Ìý |
Communications installations | 4,075,000 | 163.00 | 5.73 |
Fully addressable fire and smoke detection and alarm system: 25,000m2 @ £30 | Ìý | Ìý | Ìý |
Voice/public address system with interfaces to flight information, fire and security systems: 25,000m2 @ £16 | Ìý | Ìý | Ìý |
Intruder detection: 25,000m2 @ £10 | Ìý | Ìý | Ìý |
Allowance for security, CCTV and access control: 25,000m2 @ £32 | Ìý | Ìý | Ìý |
Wireways for telephones, data and structured cable: 25,000m2 @ £13 | Ìý | Ìý | Ìý |
Structured cable installation, linking check-in, ticket desks and security control points: 25,000m2 @ £30 | Ìý | Ìý | Ìý |
Allowance for flight information display system; 100 LED displays, 150 monitors: item @ £800,000 | Ìý | Ìý | Ìý |
Special installations | 1,350,000 | 54.00 | 1.90 |
ºÃÉ«ÏÈÉúTV management system: 25,000m2 @ £54 | Ìý | Ìý | Ìý |
(Baggage-handling installation excluded) | Ìý | Ìý | Ìý |
Builder’s work in connection | 760,000 | 30.40 | 1.07% |
Allowance for forming holes, chases etc @ 3%: item @ £760,000 | Ìý | Ìý | Ìý |
Preliminaries and contingencies | 13,915,200 | 556.61 | 19.57 |
Allowance for contractor’s overheads, site establishment and site supervision @ 18%: item @ £10,315,000 | Ìý | Ìý | Ìý |
Allowance for commissioning management: item @ £250,000 | Ìý | Ìý | Ìý |
Allowance for design reserve @ 5%: item @ £3,350,200 | Ìý | Ìý | Ìý |
Total construction cost (building only) | 71,100,000 | 2844.00 | 100.00 |
Acknowledgments: Davis Langdon would like to thank Richard Gammon of Capita Architecture and Tony Potter, Nigel Addy, John Grounds and David Unwin of Davis Langdon’s airports sector for their assistance in producing this cost model |
Site powered by