Comparable efficiencies of low-energy and renewable technologies
Renewable technologyCandidate buildingsAnnual saving per £100,000 cost
ÌýÌýkWhkg CO2
Tower-mounted windIndustrial, distribution 90,00039,000*
ºÃÉ«ÏÈÉúTV-mountedMost types of building36,00015,500*
Photovoltaic panels or roofMost types of building11,5004,800*
Photovoltaic rain screen or glassPrestige offices or retail8,0003,450*
Passive solar water heatingResidential, commercial, hotels and leisure 45,0008,500**
Ground-source heat pumpMost types of building36,0006,850**
Borehole coolingOffices, hotel, leisure11,0004,650*
Biomass boilersMost types of building90,00017,000**
Biomass CHPIndustrial, hotel,26,00010,800*
Ìýleisure, hospital57,00010,800**
ÌýÌýÌýÌý
* compared with electricity
** compared with gas
Indicative capital costs of ground source heat pumps and conventional heating and cooling plant
ÌýSmall (4 kWh) (£)Medium (50 kWh) (£)Large (400 kWh) (£)
Condensing boiler and flue1,2004,20017,000
Air-cooled chiller1,0006,00050,000
Heat pump3,500-4,50030,000-40,000140,000-170,000
Horizontal “Slinky” collector3,000-4,00040,000-50,000360,000-390,000
Vertical borehole collector2,000-3,00050,000-70,000360,000-390,000
Costs exclude distribution pipework from the collection network to the heat pump and plant room
installations. Main contractors’ preliminaries, overheads and profit are also excluded.