- ºÃÉ«ÏÈÉúTV
All the latest updates on building safety reformRegulations latest
- Focus
- Comment
- Programmes
- CPD
- ºÃÉ«ÏÈÉúTV the Future
- Data
2024 events calendar
ºÃÉ«ÏÈÉúTV Awards
Keep up to date
- ºÃÉ«ÏÈÉúTV Boardroom
All the latest updates on building safety reform
2024 events calendar
ºÃÉ«ÏÈÉúTV Awards
Keep up to dateSpecification options | |||
Steelwork exposed to atmosphere | Capital cost £/m² | Lifecycle cost for 50 or 120 years £/m² | Period to first major maintenance years |
Category 4: 50 years | Ìý | Ìý | Ìý |
Hot dip galvanized to BS EN ISO 1461 mean coating thickness 85µm | 35 | 42 | 80 |
Epoxy micaceous iron oxide (MIO) finish: 100µm; Zinc phosphate epoxy primer: 80µm. Steel: blast cleaned to Sa 2.5 | 22 | 61 | 20 |
High solids polyurethane finish:100µm. inc phosphate epoxy primer: 100µm. Steel: blast cleaned to Sa 2.5 | 17 | 48 | 20 |
Category 5: 120 years | Ìý | Ìý | Ìý |
Hot dip galvanized to BS EN ISO 1461 mean coating thickness 85µm | 35 | 43 | 80 |
Hot dip galvanized mean coating thickness 140µm includes shotblast preparation | 50 | 58 | 120 |
Epoxy micaceous iron oxide (MIO) finish: 100µm; Zinc phosphate epoxy primer: 80µm. Steel: blast cleaned to Sa 2.5 | 22 | 73 | 20 |
High solids polyurethane finish:100µm. Zinc phosphate epoxy primer: 100µm. Steel: blast cleaned to Sa 2.5 | 17 | 57 | 20 |
Table notes: External environment category C3 to ISO 9223, Average annual zinc corrosion rate: 1µm/yr. First protective system factory applied. Subsequent coating assumed at 8-10 year intervals including allowance for treating corosion and quinquennial inspections. Dimensions refer to dry film thicknesses. Discount rates of 3.0% (50 years) and 2.5% (120 years) are used to calculate net present values. There are a huge range of alternative coating systems; costs and options are indicative. Use specialist advice for suitable options and a cost analysis based on project specific information for a realistic best value appraisal |
Site powered by