- ºÃÉ«ÏÈÉúTV
All the latest updates on building safety reformRegulations latest
- Focus
- Comment
- Programmes
- CPD
- ºÃÉ«ÏÈÉúTV the Future
- Data
2024 events calendar
ºÃÉ«ÏÈÉúTV Awards
Keep up to date
- ºÃÉ«ÏÈÉúTV Boardroom
All the latest updates on building safety reform
2024 events calendar
ºÃÉ«ÏÈÉúTV Awards
Keep up to dateMaterial assessment: ground slab | ||
Total embodied carbon emissions/m2 of slab area103.2 | ||
Concrete mix based on 30% PFA substitution of OPC | ||
Ìý | Kg embodied carbon/unit | Kg embodied carbon/m2 gifa |
Excavation (m3)/ PFA mix | 11.1 | 6.66 |
Disposal (m3) | 16.7 | 10.02 |
Blinding, 75mm thick (m3) | 9 | 0.72 |
Concrete, 200 thick, OPC cement (m3) | 309.1 | 61.82 |
Reinforcement, A252 mesh (kg) | 0.44 | 1.72 |
Movement joints (m) | 8.7 | 0.44 |
Damp proof membrane (m2) | 0.7 | 0.7 |
Insulation board (m2) | 1.7 | 1.7 |
Total embodied carbon emissions/m2 of slab area | Ìý | 83.8 |
Exclusions: demolition and disposal of slab construction at end of life |
ºÃÉ«ÏÈÉúTV assessment: distribution centre | ||||
Ìý | £/m2 gifa | % | Kg embodied carbon/m2 gifa | % |
Substructure | 59 | 17.4 | 146.5 | 42.3 |
Frame, upper floors and stairs | 60.7 | 17.9 | 68.4 | 19.7 |
Roof | 48.5 | 14.3 | 41.6 | 12 |
External walls, windows and doors | 14.7 | 4.3 | 13.3 | 3.8 |
Internal walls and doors | 0.8 | 0.2 | 2.3 | 0.7 |
Internal finishes | 4.4 | 1.3 | 5.6 | 1.6 |
ºÃÉ«ÏÈÉúTV services installation, including dock levellers | 31.8 | 9.4 | 30.2 | 8.7 |
External works and services | 81.4 | 24 | 38.6 | 11.1 |
Preliminaries | 37.5 | 11.1 | Ìý | Ìý |
Total construction cost/m2 gifa | 338.8 | 100 | Ìý | Ìý |
Total embodied carbon emissions/m2 | Ìý | Ìý | 346.5 | 100 |
Exclusions: site preparation, site abnormals, distribution centre and administration area fit-out, operating equipment, professional fees |
Site powered by