- ºÃÉ«ÏÈÉúTV
All the latest updates on building safety reformRegulations latest
- Focus
- Comment
- Programmes
- CPD
- ºÃÉ«ÏÈÉúTV the Future
- Data
2024 events calendar
ºÃÉ«ÏÈÉúTV Awards
Keep up to date
- ºÃÉ«ÏÈÉúTV Boardroom
All the latest updates on building safety reform
2024 events calendar
ºÃÉ«ÏÈÉúTV Awards
Keep up to dateSample of recent tender return costs | |||
Pile type | Pile length (m) | Diameter (mm) | Pile cost (£) |
Independent cast insitu reinforced concrete, bored | 15 | 300 | 200–250 |
Ìý | 15 | 350 | 275–300 |
Ìý | 15 | 450 | 475–525 |
Ìý | 20 | 350 | 375–425 |
Ìý | 20 | 450 | 625–700 |
Ìý | 30 | 750 | 1550-1750 |
Ìý | 35 | 1000 | 7000–7500 |
Secant reinforced concrete wall, bored | 20 | 800 | 1900–2100 |
Ìý | 20 | 600 | 1750–2000 |
Precast concrete driven piles | 15 | 340 | 210–330 |
Ìý | 15 | 380 | 325–350 |
Ìý | 15 | 430 | 475–500 |
Costs assume the placement of more than 100 piles | |||
Costs exclude general preliminaries and main contractors’ preliminaries, overhead and profit and contingencies. Cost current at first quarter 2006. |
Site powered by