Keep up to dateCost analysis for repairing of corrosion-damaged reinforced concrete structures | ||
Specification options | Capital costs £/m2 | Net present value for 60 years £/m2 |
Patch repair – hand applied (< 0.5 m2) on carbonated concrete with anticarbonation coating. Suitable in instance where carbonation on a building facade usually requires relatively small, isolated repairs | 360 | 651.08 |
Patch repair – hand applied (< 0.5 m2) on highly chloride contaminated concrete with no additional protection Suitable in instance where carbonation on a building facade usually requires relatively small, isolated repairs | 360 | 2,034.62 |
Recast (0.5-5.0 m2) on carbonated concrete with anticarbonation coating. Suitable for large-volume repairs or where large areas of dense reinforcement are present | 180 | 325.54 |
Recast (0.5-5.0 m2) on highly chloride contaminated concrete with no additional protection.Suitable for large-volume repairs or where large areas of dense reinforcement are present | 180 | 1,017.31 |
Sprayed concrete (2-100 m2) on carbonated concrete with anticarbonation coating. Often chosen to repair fire-damaged structures as it can be applied quickly | 180 | 325.54 |
Sprayed concrete (2-100 m2) on highly chloride contaminated concrete with no additional protection.Often chosen to repair fire-damaged structures as it can be applied quickly | 180 | 1,017.31 |
Ìý | Ìý | Ìý |
Table notes | ||
Cost for each of the repair techniques includes typical mobilisation, access and time costs | ||
Exceptional costs have been excluded (such as high access cost, lane rental for motorway work, etc) | ||
Costs are presented as £/m2 and assumes good quality workmanship | ||
Typical life estimates for repairs are 20 years for carbonated concrete with anticarbonation coating and five years for highly chloride contaminated concrete with no additional protection | ||
Expected service life of the structure is assumed to be 60 years | ||
A discount rate of 3.5% is used to calculate net present values throughout the study period | ||
Further information | ||
BRE provides a complete range of consultancy, commissioned research, certification and testing services covering all aspects of the built environment and associated industries. For more information, visit http://projects.bre.co.uk/rebarcorrosioncost, email watermana@bre.co.uk or phone 01923-664267 |