Keep up to dateElemental cost breakdown | ||
Ìý | £ | £/³¾2 |
Substructure | 160,000 | 182 |
Precast floors and staircase | 65,000 | 73.9 |
Structural frame including fire protection | 69,000 | 78.5 |
Roofs | 71,000 | 80.8 |
External walls including balconies | 166,000 | 188.9 |
Windows and external doors | 92,000 | 104.7 |
Internal walls and partitions | 63,000 | 71.7 |
Internal joinery including doors and frames | 109,000 | 124 |
Floor, wall and ceiling finishes | 53,000 | 60.3 |
Kitchen fittings including white goods | 31,000 | 35.3 |
Electrical installation | 82,000 | 93.3 |
Hot and cold water installation inc. sanitaryware | 177,000 | 201.4 |
Solar panelling | 34,000 | 38.7 |
Lightning protection | 6,000 | 6.8 |
Drainage | 27,000 | 30.7 |
External works | 17,000 | 19.3 |
Mains services | 17,000 | 19.3 |
Preliminaries | 90,131 | 102.5 |
Design fees | 75,000 | 85.3 |
Agreed maximum price | 1,404,131 | 1597.4 |
Gross internal floor area incl. circulation: 879 m2 | Ìý | Ìý |