Keep up to dateElemental cost analysis | |||
Gross floor area is 7860 m2 | |||
Total cost of element (£) | Cost/m2 gfa (£) | % of total cost | |
Element | |||
Demolition | 134 300 | 17.09 | 2.33 |
Substructure | 363 600 | 46.26 | 6.31 |
Superstructure | 1 089 100 | 138.56 | 18.91 |
Frame | 272 600 | 34.68 | 4.73 |
Upper floors | 6 900 | 0.88 | 0.12 |
Roof | 72 900 | 9.27 | 1.27 |
Stairs | 106 500 | 13.55 | 1.85 |
External walls | 473 200 | 60.2 | 8.22 |
Windows and external doors | 58 600 | 7.46 | 1.02 |
Internal walls and partitions | 95 100 | 12.1 | 1.65 |
Internal doors | 3 300 | 0.42 | 0.06 |
Internal finishes | 1 116 200 | 142.01 | 19.38 |
Wall finishes | 260 700 | 33.17 | 4.53 |
Floor finishes | 515 300 | 65.56 | 8.95 |
Ceiling finishes | 340 200 | 43.28 | 5.91 |
Fittings and furnishings | 601 200 | 76.49 | 10.44 |
Services | 2 318 000 | 294.91 | 40.25 |
Disposal installation | 25 000 | 3.18 | 0.43 |
Water/treatment installation | 407 900 | 51.9 | 7.08 |
Space heating and air treatment | 1 059 800 | 134.83 | 18.4 |
Electrical installation | 757 800 | 96.41 | 13.16 |
Protective installation | 17 200 | 2.19 | 0.3 |
Communication installation | 11 300 | 1.44 | 0.2 |
Special installations | 9 700 | 1.23 | 0.17 |
Builders’ work in connection | 29 300 | 3.73 | 0.51 |
ºÃÉ«ÏÈÉúTV subtotal | 5 622 400 | 715.32 | 97.63 |
External works | 136 600 | 17.38 | 2.37 |
Site works | 90 200 | 11.48 | 1.57 |
Drainage | 46 400 | 5.9 | 0.81 |
Total cost estimate | 5 759 000 | 732.7 | 100 |