- ºÃÉ«ÏÈÉúTV
All the latest updates on building safety reformRegulations latest
- Focus
- Comment
- Programmes
- CPD
- ºÃÉ«ÏÈÉúTV the Future
- Data
2024 events calendar
ºÃÉ«ÏÈÉúTV Awards
Keep up to date
- ºÃÉ«ÏÈÉúTV Boardroom
All the latest updates on building safety reform
2024 events calendar
ºÃÉ«ÏÈÉúTV Awards
Keep up to dateCruciform ºÃÉ«ÏÈÉúTV refurbishment cost analysis | |||
Total gross internal floor area = 13 000 m2 | |||
Description | Total cost (£) | £/³¾2 | % of total cost |
Works packages | 6 173 850 | 474.91 | 21.76 |
Demolition works | 678 684 | 52.21 | 2.39 |
Substructure | 680 472 | 52.34 | 2.4 |
Structural alterations | 978 919 | 75.3 | 3.45 |
External fabric | 2 255 430 | 173.49 | 7.95 |
External cladding | 162 236 | 12.48 | 0.57 |
Slate, lead and felt roofs | 603 985 | 46.46 | 2.13 |
Rainwater goods | 117 590 | 9.05 | 0.41 |
Windows | 696 534 | 53.58 | 2.46 |
Internal finishes packages | 5 305 735 | 408.13 | 18.7 |
Floor finishes | 678 558 | 52.2 | 2.39 |
Wall finishes | 1 372 874 | 105.61 | 4.84 |
Carpentry/internal doors | 807 817 | 62.14 | 2.85 |
Internal partitions | 358 756 | 27.6 | 1.26 |
Suspended ceilings | 515 010 | 39.62 | 1.82 |
Metalwork | 203 473 | 15.65 | 0.72 |
Terrazzo/marble refurbishment | 64 728 | 4.98 | 0.23 |
Fixtures, fittings and equipment | 1 304 519 | 100.35 | 4.6 |
M&E installations | 9 013 404 | 693.34 | 31.77 |
Electrical | 1 763 060 | 135.62 | 6.21 |
Fire alarm and communications | 509 770 | 39.21 | 1.8 |
Security systems | 187 421 | 14.42 | 0.66 |
Heating and ventilation | 3 601 913 | 277.07 | 12.7 |
ºÃÉ«ÏÈÉúTV management system installation | 874 399 | 67.26 | 3.08 |
Medical gases | 348 491 | 26.81 | 1.23 |
Above-ground drainage | 190 928 | 14.69 | 0.67 |
Sanitaryware | 66 335 | 5.1 | 0.23 |
Lift installations | 202 560 | 15.58 | 0.71 |
Cold rooms and lab equipment | 945 793 | 72.75 | 3.33 |
Builder’s work for services | 322 734 | 24.83 | 1.14 |
Total construction | 20 492 989 | 1 576.38 | 72.23 |
Preliminaries | 4 283 913 | 329.53 | 15.1 |
Design fees | 1 657 252 | 127.48 | 5.84 |
Contingency | 774 677 | 59.59 | 2.73 |
Overheads | 1 162 014 | 89.39 | 4.1 |
Total cost | 28 370 845 | 2 182.38 | 100 |
Projected FM costs over 25-year PFI contract | |
FM services | £/²â±ð²¹°ù |
Life-cycle or sinking fund | 350 000 |
ºÃÉ«ÏÈÉúTV and engineering maintenance | 140 000 |
Security and messenger services | 180 000 |
Cleaning, including laundry and pest control | 185 000 |
Total, including helpdesk and management services | circa 1 000 000 |
Site powered by