- ºÃÉ«ÏÈÉúTV
All the latest updates on building safety reformRegulations latest
- Focus
- Comment
- Programmes
- CPD
- ºÃÉ«ÏÈÉúTV the Future
- Data
2024 events calendar
ºÃÉ«ÏÈÉúTV Awards
Keep up to date
- ºÃÉ«ÏÈÉúTV Boardroom
All the latest updates on building safety reform
2024 events calendar
ºÃÉ«ÏÈÉúTV Awards
Keep up to dateCar parks - Current construction costs | ||
Unit size m2/car | Unit cost £/m2 gifa | |
Surface | 20-22 | 40-55 |
Surface landscaped | 20-24 | 65-95 |
Grade and upper level | 23-30 | 135-200 |
Multistorey flat slab | 23-30 | 200-320 |
Semi-basement with natural ventilation | 25-30 | 300-380 |
Industrial buildings - Current construction costs | ||
Unit size m2 gifa | Shell with heating and lighting to office areas only £/m2 gifa | Unit including services to production area £/m2 gifa |
500-1000 | 260-580 | 480-680 |
1000-2500 | 210-500 | 430-620 |
greater than 2500 | 270-500 | 430-620 |
Warehouse and distribution centres - Current construction costs | ||
Unit size (m2) | ||
2000-10 000 £/m2 gifa | 10 000+ £/m2 gifa | |
Low bay, speculative | 220-400 | 230-300 |
Low bay, owner-occupied | 330-600 | 300-550 |
Business park offices - Current construction costs (including developer’s finish) | ||
Unit size (m2) | ||
Less than 2000 £/m2 gifa | More than 2000 £/m2 gifa | |
Functional – non air-conditioned | 650-800 | 600-750 |
Medium quality – non air-conditioned | 700-900 | 650-850 |
High quality – air-conditioned | – | 850-1200 |
High quality – mixed mode ventilation, for owner occupiers | – | 1150-1600 |
West End and City offices - Current construction costs (including developer’s finish) | |||
Low rise £/m2 gifa | Medium rise £/m2 gifa | High rise £/m2 gifa | |
High-quality speculative offices | |||
air-conditioned | 900-1200 | 1000-1300 | – |
mixed-mode ventilation | 1150-1600 | 1300-1600 | – |
High-quality speculative City offices | |||
air-conditioned | – | 1500-1800 | 1650-2200 |
High-quality owner-occupied City offices (including owner’s fit-out) | |||
air-conditioned | – | 1950-2600 | 2050-3000 |
Cost of the City of London speculative and owner-occupied offices are based on a City of London location. The speculative office costs are based on a South-east England location |
Office fit-out - indicative costs for fit-out of office | ||
City/West End offices £/m2 nia | Out-of-town offices £/m2 nia | |
General office space – open plan | 490-570 | 390-440 |
General office space – part cellular | 650-880 | 490-610 |
Senior executive offices | 1200-1550 | 720-1000 |
Meeting areas | 650-900 | 500-650 |
Conference suites | 1350-1700 | 880-1100 |
Reception area | 1600-2000 | 950-1200 |
Back of house/storage | 540-640 | 280-440 |
Restaurant | 1660-2450 | 1330-1960 |
Kitchen | 2000-2500 | 1600-2000 |
Cost of City/West End office fit-outs are based on a central London location. The out-of-town office fit-out costs are based on a South-east England location. All rates are based on net internal floor area. Costs of furniture, IT wiring and equipment are excluded. |
Supermarkets - Current construction costs | |
Unit cost £/m2 gifa | |
Shell | 250-650 |
Supermarket fit-out | 900-1900 |
Hypermarket fit-out | 900-1300 |
Shopping centres - Current construction costs | |
Unit rate £/m2 gifa | |
New build shopping centre | |
mall, comfort-cooled | 2500-3500 |
food court | 2800-3600 |
Retail shells | |
anchor tenants, capped-off services | 600-700 |
medium/small store units, capped-off services | 700-800 |
service corridors | 1300-1600 |
service yard (surface level only) | 800-1000 |
service yard (basement) | 1000-1400 |
New build factory outlet centre | |
retail units with enclosed mall | 950-1400 |
retail unit with open mall | 430-650 |
Shopping centre refurbishment | |
mall, limited scope | 800-1250 |
mall, comprehensive | 1200-1750 |
Leisure centres - Current construction costs | ||
Indicative area m2 gifa | Unit cost m2 gifa | |
Dry leisure centre | 1000-1500 | 700-1100 |
Wet and dry leisure centre | 4500-9000 | 1300-1850 |
Swimming pool – 25 m long | 1800-2500 | 1100-1850 |
Swimming pool – 50 m long, international competition standard | n/a | 2250-2750 |
Out-of-town health and fitness club (shell and fit-out, including pool) | 3200-4200 | 900-1350 |
Leisure centre extension to hotel (shell and fit-out, including pool) | 450-800 | 1300-1950 |
Theatres - Current construction costs | |
£/m2 gifa | |
Opera house | |
new build | 2850-3500 |
Large theatre (more than 500 seats) | |
new build | 1800-2700 |
refurbishment | 1100-2000 |
Studio/workshop theatre | |
new build | 1000-1500 |
Grandstands and stadia - Current construction costs | |
Unit cost £/seat | |
Basic stand; WCs and concession areas only | 300-600 |
Medium quality stand; WCs, concession areas and limited hospitality | 600-1300 |
High-quality stand; changing facilities, offices, retail, hospitality areas and conference facilities | 1300-2500 |
National stadium; full facilities including retail, hospitality and conferencing; retractable roof and pitch | 2500-4000 |
Indoor arena with permanent ice pad and demountable running track, with 50% retractable seating (Unit costs based on higher seating capacity achieved in ice rink configuration) | 4000-4500 |
Construction cost estimates of stadia, grandstands and arenas should be based on a clear understanding of the cost drivers of a specific scheme. There are many development variables that may not directly be affected by the number of seats. These include: tier arrangement, roof structure, sight lines, building footprint and provision of additional space for hospitality/community use. Estimates prepared on a cost/seat basis without taking into account these variables could be inaccurate. |
Schools and colleges - Current construction costs | |
Unit rate £/m2 gifa | |
Classroom blocks | 600-1000 |
Laboratories | 800-1050 |
Craft, design and technology | 750-1050 |
Music | 900-1300 |
Museums and art galleries - Current construction costs | |
Unit costs £/m2 | |
International standard art gallery (exc fit-out) | 2500+ |
National standard museum (exc fit-out) | 1700+ |
National standard independent specialist museum (exc fit-out) | 1500-2500 |
Independent commercial art gallery | 850-1200 |
Refurbishment of historic building to create gallery space to international standards | Up to 4000 |
Libraries and learning resource centres - Current construction costs | |
Unit costs £/m2 gifa | |
Learning resource centres – economical | 750-1000 |
Learning resource centres – high-quality | 1000-1400 |
University and collegiate libraries (inc fittings) | 1800-2300 |
Public libraries | 1150-1550 |
Social housing - Current construction costs | ||
Unit size m2 | Unit cost £/m2 gifa | |
Terrace, two bed | 65 | 445-705 |
Semi-detached, three bed | 90 | 500-765 |
Low-rise flats, two bed | 62 | 590-820 |
Medium-rise flats, two bed | 62 | 645-900 |
Private housing - Current construction costs | ||
£/m2 gifa | £/m2 saleable area | |
Three- to four-storey villa | ||
Load-bearing construction, limited finishes, low-pressure hot water central heating | 900-1050 | 1075-1250 |
High-quality multistorey apartments | ||
Framed construction, cladding and curtain walling, multiple core layout, limited finishes, limited comfort cooling, all-electric heating installation | 1500-1700 | 1900-2100 |
Prestige quality multistorey apartments | ||
Framed construction, high-quality stone and glass curtain walling, multiple core layout, extensive high-quality finishes, comfort cooling throughout, low-pressure hot-water central heating | 2100-2300 | 2560-2750 |
All costs in this table are based on an inner London location |
Hotels - Construction costs (including furniture, fittings and equipment) | |||
Average gross floor area per room £/m2 gifa | Unit cost £/m2 gifa | Unit cost £000/bedroom | |
Luxury city-centre hotel | |||
multistorey, conference and wet leisure facilities | 70-130 | 1500-2000 | 135-200 |
Business town-centre/provincial hotel | |||
4-6 storeys, conference and wet leisure facilities | 70-100 | 1200-1750 | 90-130 |
Mid-range provincial hotel | |||
2-3 storeys, conference and leisure facilities | 55-70 | 1100-1500 | 55-85 |
2-3 storeys, bedroom extension | 35-45 | 800-1250 | 30-45 |
City-centre aparthotel | |||
4-7 storeys apartments with self-catering facilities | 50-60 | 900-1200 | 45-75 |
Budget city-centre hotel (new build) | |||
4-6 storeys, dining and bar facilities | 35-45 | 950-1050 | 35-50 |
Budget city-centre hotel (office conversion) | |||
4-6 storeys, excluding dining facilities | 32-38 | 750-1150 | 22-45 |
Budget roadside hotel | |||
2- to 3-storey lodge, excluding dining facilities | 28-35 | 850-1050 | 26-33 |
Regional variations | |
Inner London | 1.09 |
Outer London | 1.03 |
South-west England | 0.93 |
East Midlands | 0.9 |
West Midlands | 0.9 |
East Anglia | 0.91 |
Yorkshire and Humberside | 0.88 |
North-west England | 0.88 |
Northern England | 0.92 |
Scotland | 0.92 |
Wales | 0.87 |
Northern Ireland | 0.76 |
The cost breakdown is based on a project in South-east England and should be adjusted by the following location factors for schemes in other regions. |
Site powered by