Keep up to dateTotal build cost of the three standard specification models | |||
Model | Area m2 | £ | £/³¾2 |
Small | 1396 | 880,000 | 630 |
Medium | 1523 | 940,000 | 617 |
Large | 1784 | 1,190,000 | 667 |
The standard specification includes: | |
Low maintenance standing seam aluminium roof | |
Acoustic steel lining panels spanning between the roof beams | |
Curved steel roof beams located between the badminton courts | |
Black tube, direct fired radiant heating to sports hall | |
Solid beech floors to sports hall | |
Low-energy compact fluorescent lighting to sports hall | |
Comfort cooling in the fitness area and multipurpose room | |
Ceramic tiles to floors and walls in the changing rooms/showers | |
Profiled steel external wall cladding | |
Large rooflights to the main changing areas | |
Warm air supply and mechanical extract to changing areas | |
Automatic doors to the main entrance lobby | |
Windows with blinds between social area and sports hall | |
Optional extras | |
Glazed wall with blinds between social area and sports hall | £32,000 |
Glazing to sports hall gable end wall (if north orientation) | £15,000 |
Low velocity, ducted warm air heating to sports hall | £9,000 |
Full public address system to all areas | £8,000 |