Keep up to dateCost breakdown | |||
Element cost | cost/m2 gfa £ | % of total cost | |
Substructure | 13,954,000 | 117.80 | 5.45% |
Allowance for breaking out existing slabs and retaining wallsItem @ 250,000 | |||
Allowance for preparatory work and dewatering all of the excavationsItem @ 600,000 | |||
Foundations: large diameter bored piles, for example 40 m deep; 2 m thick ground slab 2,600 m2 @ 1,500 | |||
Extra for three-level basement construction: part secant piled walls, part diaphragm walls; insitu concrete frame and floors; waterproofing; drainage7,800 m2 @ 1,000 | |||
Allowance for removal of obstructionsItem @ 250,000 | |||
Allowance for treatment of contaminated surfaces2,600 m2 @ 40 | |||
Allowance for temporary worksItem @ 750,000 | |||
Allowance for lift pits, escalator pits, tower crane bases, etcItem @ 300,000 | |||
Frame | 41,928,000 | 353.97 | 16.38% |
Structural steel frame to upper floors, based on 200 kg/m2 overall (avg rate)22,130 t @ 1,200 | |||
Secondary steelwork for cladding, trimming openings, etc2,200 t @ 1,600 | |||
Extra for feature steel framing in reception/other areasItem @ 500,000 | |||
Fire protection to frame based on a combination of two-hour boarding and one-hour intumescent spray (avg rate used, based on 20 m2/tonne)482,600 m2 @ 20 | |||
Allowance for concrete casing or infilling to some columnsItem @ 500,000 | |||
Allowance for wind canopy structuresItem @ 200,000 | |||
Allowance for additional ductile connectionsItem @ 1,000,000 | |||
Upper floors | 8,146,000 | 68.77 | 3.18% |
Composite floor construction; 130 mm thick reinforced insitu concrete; galvanized steel decking; total design load 4.5 kN/m2110,650 m2 @ 55 | |||
Extra for 7.5 kN/m2 loading to plant and other areas10,000 m2 @ 25 | |||
Extra for forming ramps, steps, and so onItem @ 500,000 | |||
Allowance for knock-out panels in upper floors constructionItem @ 200,000 | |||
Allowance for lift pits, escalator pits, etc in upper floors constructionItem @ 150,000 | |||
Allowance for insulation to edges of floor slabs8,800 m @ 75 | |||
Extra for intermediate floors to atrium at six-storey intervalsItem @ 300,000 | |||
Roof | 1,657,000 | 13.99 | 0.65% |
Waterproofing over external slab at ground level (over basements)124 m2 @ 80 | |||
Composite roof slab construction, with waterproofing, insulation, ballast2,350 m2 @ 200 | |||
Extra for access paving to 10% of roof area250 m2 @ 75 | |||
Extra for stone paving to terraces 100 m2 @ 150 | |||
Architectural balustrading to roof terraces50 m @ 550 | |||
Glazed atrium roof, with opening lights for ventilation/smoke extract; framing200 m2 @ 1,200 | |||
Allowance for roof feature/screening to roof level plantItem @ 400,000 | |||
Allowance for perimeter safety rails, perimeter detailing & interface detailsItem @ 250,000 | |||
Allowance for plant bases and base for communication mastItem @ 50,000 | |||
Allowance for roof-level plant enclosures; structural steel frame; profiled aluminium raised seam roof cladding, insulationItem @ 175,000 | |||
Stairs | 3,086,000 | 26.05 | 1.21% |
Painted mild steel escape stairs in two straight flights, including all finishes94 @ 16,000 | |||
Precast concrete stairs serving basements8 @ 14,000 | |||
Allowance for feature staircasesItem @ 900,000 | |||
Steel stairs within retail areas8 @ 15,000 | |||
Allowance for disabled access provisionsItem @ 250,000 | |||
Allowance for ladders and catwalks in plant roomsItem @ 200,000 | |||
External walls | 61,264,000 | 517.21 | 23.94% |
Triple glazed “active wall” facade system: double-glazed outer skin, single-glazed inner skin with opening lights; integral motorised blinds51,000 m2 @ 875 | |||
Allowance for enhanced articulation in certain areasItem @ 5,000,000 | |||
Double-glazed atrium wall3,700 m2 @ 1,000 | |||
Double-height glass wall system to ground floor, including all supports 800 m2 @1,500 | |||
Glass shop fronts230 m2 @800 | |||
Louvres as external walling to plant floors/roof plant areas3,100 m2 @550 | |||
Solid walls in loading bay/service yardItem @ 50,000 | |||
Unitised metal cladding to exposed core areas, and loading bay8,000 m2 @ 450 | |||
Metal cladding to soffitsItem @ 150,000 | |||
Allowance for entrance canopy/wind canopiesItem @ 350,000 | |||
Allowance for mock-ups, testing and so onItem @ 700,000 | |||
External doors | 916,000 | 7.73 | 0.36% |
Double-glazed aluminium frame exit and fire escape doors25 @ 4,000 | |||
High-quality motorised revolving doors and side doors for disabled access4 @ 150,000 | |||
Shopfront automatic doors8 @ 7000 | |||
Access doors to roof plant areasItem @ 40,000 | |||
Metal doors in service areasItem @ 30,000 | |||
Motorised security shutters to car park/loading bay entrance (including cladding interfaces)2 @ 45,000 | |||
Internal walls and partitions | 7,153,000 | 60.39 | 2.80% |
Two-hour metal stud partitions around cores29,100 m2 @ 90 | |||
One-hour metal stud partitions within core areas17,900 m2 @ 55 | |||
Extra for shaft wall constructionItem @ 500,000 | |||
Single-glazed wall around atriums2,500 m2 @ 700 | |||
Block walls in basements and plant areas4,200 m2 @ 50 | |||
Block walls dividing retail units500 m2 @ 60 | |||
Cantilevered glass balustrade around mezzanine22 m2 @ 1,200 | |||
Allowance for substation enclosure and accessItem @ 200,000 | |||
WC cubicles, including doors and ironmongery450 @ 1,250 | |||
Full height laminate-faced duct access panels to toilets1,800 m2 @ 150 | |||
Internal doors | 2,483,000 | 20.96 | 0.97% |
High quality glazed double doors/side panels to lift lobbies96 @ 7,000 | |||
Hardwood doors in core areas, fire-rated where necessary (average rate)575 @ 1,350 | |||
Riser cupboard doors: fire-rated hardwood doorsets490 @ 1,500 | |||
Metal doors in plant/service areas,160 @ 1,250 | |||
Allowance for fire-rated access panelsItem @ 100,000 | |||
Wall finishes | 3,400,000 | 28.7 | 1.36% |
Stone cladding to entrance lobby and lift lobbies5,120 m2 @ 300 | |||
Allowance for feature wall in main receptionItem @ 200,000 | |||
Finish to edges of slabs overlooking reception22 m @ 300 | |||
Emulsion to core walls/plasterboard partitions & other walls51,700 m2 @ 5 | |||
GRG circular casings to internal columns in office areas3,000 m2@ 175 | |||
Emulsion paint to service areas, plant rooms, facilities offices, storage areas25,000 m2 @ 5 | |||
Good-quality ceramic tiling to toilets6,885 m2 @ 100 | |||
Ceramic tiling in cleaners’ cupboards and service areas1,000 m2 @ 60 | |||
Floor finishes | 2,771,000 | 23.39 | 1.08% |
Granite tiles to main entrance lobby, lift lobbies, | |||
mezzanine areas and atrium base4,100 m2 @ 300 | |||
Good-quality ceramic tiles to toilets, lightweight | |||
concrete to make up levels4,000 m2 @ 125 | |||
Raised floors to lift lobbies2,580 m2 @ 37 | |||
Ceramic tiling to cleaners’ cupboards and service areas350 m2 @ 50 | |||
Raised floor and good-quality carpet tiles to circulation areas3,820 m2 @ 85 | |||
Epoxy paint on screed to plant and service areas9,290 m2 @ 25 | |||
Sealer/hardener/wpm/wear course to loading dock, | |||
service areas, car park1,700 m2 @ 65 | |||
Allowance for making up levels in other areasItem @ 50,000 | |||
Allowance for linoleum to facilities offices, storage areas, and so onItem @ 30,000 | |||
Entrance mats and matwellsItem @ 80,000 | |||
Allowance for sundry floor finishes in other areasItem @ 100,000 | |||
Ceiling finishes | 1,879,000 | 15.86 | 0.73% |
Feature ceiling to entrance lobby, mezzanine and lift lobbies3,900 m2 @ 250 | |||
Non-standard metal suspended ceiling to circulation areas3,820 m2 @ 100 | |||
Metal suspended ceiling to toilets4,000 m2 @ 50 | |||
Paint finish to soffit of slabs to plant areas9,290 m2 @ 10 | |||
Acoustic insulation lining to car park soffit950 m2 @ 30 | |||
Allowance for other ceiling finishes/detailingItem @ 200,000 | |||
Furniture and fittings | 4,092,000 | 34.55 | 1.60% |
Granite vanity tops in toilets650 m @ 1,100 | |||
Fittings to toilets (including allowance for disabled fittings)4,000 m2 @ 500 | |||
Wall protection in goods lift lobbies860 m2 @ 60 | |||
Main reception desk/screenItem @ 100,000 | |||
Main entrance and statutory signage; external signageItem @ 250,000 | |||
Car park bollards, column guards, entrance barriersItem @ 75,000 | |||
Cycle racking and cycle changing area fit-outItem @ 50,000 | |||
Dockmaster/security room fit-outsItem @ 30,000 | |||
Rubbish compactor/bailerItem @ 35,000 | |||
Allowance for main entrance features/fittings/objets d’artItem @ 500,000 | |||
Traffic management systemItem @ 35,000 | |||
Allowance for sundry fittingsItem @ 250,000 | |||
Sanitary fittings | 785,000 | 6.63 | 0.31% |
Allowance for WCs, basins, cleaners’ sinks, urinals (average rate used) 800 @ 700 | |||
Extra for disabled toilets100 @ 2,000 | |||
Shower installations20 @ 750 | |||
Water softeners2 @ 5,000 | |||
Disposal installations | 1,808,000 | 15.26 | 0.71% |
Allowance for rainwater disposal118,450 m2 @ 5 | |||
Soil waste and vent installation118,450 m2 @ 9 | |||
Extra for drainage to retail unitsItem @ 150,000 | |||
Water installations | 1,176,000 | 9.93 | 0.46% |
Cold water: boosted rising main, bulk storage, treatment, etc118,450 m2 @ 6 | |||
Hot water services by local electric water storage heaters118,450 m2 @ 3 | |||
Water services for vending areasItem @ 60,000 | |||
Extra for supplies to retail unitsItem @ 50,000 | |||
Space heating and air treatment | 15,728,000 | 132.78 | 6.15% |
Gas installationItem @ 175,000 | |||
Low temperature hot water heating installation (including gas-fired boilers)118,450 m2 @ 22 | |||
Air-conditioning installation: air-handling plant, refrigeration, | |||
chilled water distribution for four-pipe fan coil installation to offices118,450 m2 @ 70 | |||
Toilet extract installation118,450 m2 @ 7 | |||
Smoke extract installation118,450 m2 @ 12 | |||
Dedicated extract system for external wall voidItem @ 1,150,000 | |||
Extra for smoke extract and ventilation to atrium spacesItem @ 600,000 | |||
Car park and loading bay extract ventilation118,450 m2 @ 3 | |||
Stair/lobby pressurisationItem @ 300,000 | |||
Electrical installations | 8,329,000 | 70.32 | 3.26% |
Mains and submains installations118,450 m2 @ 29 | |||
Power supply to mechanical plant118,450 m2 @ 4 | |||
Small power installations118,450 m2 @ 4 | |||
Power and controls for window blindsItem @ 450,000 | |||
Lighting, emergency lighting and small power to landlord’s areas118,450 m2 @ 15 | |||
Lighting and emergency lighting to basement areas, | |||
car park and loading bay7,812 m2 @ 60 | |||
Allowance for enhanced lighting to reception and lift lobbiesItem @ 600,000 | |||
Allowance for external lightingItem @ 200,000 | |||
Standby power installation (life safety systems only), including oil systemItem @ 450,000 | |||
Lift installations | 21,090,000 | 178.05 | 8.24% |
21-person 1600 kg passenger lift 3 m/s serving low-rise floors8 @ 600,000 | |||
21-person 1600 kg passenger lift 3.5 m/s serving mid-rise floors8 @ 750,000 | |||
21-person 1600 kg passenger lift 6 m/s serving high-rise floors8 @ 900,000 | |||
Goods lifts 3000 kg 3.5 m/s serving all floors above ground2 @ 700,000 | |||
Passenger lift serving car park, doubling as fire-fighting lift1 @ 150,000 | |||
Fire-fighting lifts serving all floors2 @ 400,000 | |||
Escalators serving reception and mezzanine4 @ 110,000 | |||
Car lift2 @ 150,000 | |||
Protective installations | 1,939,000 | 16.37 | 0.76% |
Wet/dry riser installation, with pumps, etc118,450 m2 @ 1 | |||
Sprinkler installation: common bulk storage, split pump sets118,450 m2 @ 12 | |||
Hose reels including booster set118,450 m2 @ 3 | |||
Lightning protection1 @ 45,000 | |||
Communications installations | 2,026,000 | 17.10 | 0.79% |
Fully addressable fire alarm, smoke detection, voice alarm and | |||
public address systems, interfaced to building management system118,450 m2 @ 14 | |||
Primary containment for data and communications wiring118,450 m2 @ 1 | |||
Security: CCTV/detection systems to building perimeter and in car parkItem @ 250,000 | |||
Special Installations | 2,640,000 | 22.29 | 1.03% |
ɫTV management system118,450 m2 @ 13 | |||
Complete facade and atrium cleaning installationsItem @ 1,000,000 | |||
Communications mastItem @ 100,000 | |||
Builder’s work in connection | 2,775,000 | 23.43 | 1.08% |
Builder’s work in connection with services installations, | |||
including machine bases, steel stacking framework for double-height | |||
plant, firestopping, holes, chases, etc (allow 5% of services costs)Item @ 2,775,000 | |||
Preliminaries and contingencies | 44,850,000 | 378.64 | 17.53% |
Construction manager’s pre-construction staff costsItem @ 1,000,000 | |||
Construction manager’s preliminaries, staff costs, overheads | |||
and profit (allow 15%)Item @31,650,000 | |||
Design reserve and construction contingency (allow 5%)Item @ 12,200,000 | |||
Total for shell-and-core construction | 255,875,000 | 2160.18 | 100% |
Category A fit-out | |||
Element cost | cost/m2 gfa £ | % of total cost | |
Based on net internal office area of 74,880 m2 | |||
Wall finishes | 84,000 | 0.71 | 0.26% |
Emulsion paint to external walls of cores and to internal columns16,850 m2 @ 5 | |||
Floor finishes | 4,568,000 | 38.56 | 14.12% |
Medium-grade access floor; fire breaks; dust sealant74,880 m2 @ 37 | |||
Carpet tiles74,880 m2 @ 24 | |||
Ceiling finishes | 3,370,000 | 28.45 | 10.42% |
Concealed grid metal tray suspended ceiling to office areas; | |||
acoustic quilt and fire breaks74,880 m2 @ 45 | |||
Fittings | 70,000 | 0.59 | 0.22% |
Allowance for statutory signageItem @ 70,000 | |||
Space heating and air treatment | 9,435,000 | 79.65 | 29.17% |
Extension of four-pipe fan coil installation into office areas including | |||
distribution ductwork; fan coil units; grilles and diffusers; insulation; | |||
condensate drainage; interface with building management system74,880 m2 @ 126 | |||
Electrical installation | 5,616,000 | 47.41 | 17.36% |
Lighting and emergency lighting to office areas; | |||
power to fan coil units; supply only floor boxes | |||
(small power distribution excluded); earthing and bonding74,880 m2 @ 75 | |||
Communications installation | 1,123,000 | 9.48 | 3.47% |
Final connections to fire, smoke detection, alarm and public address systems74,880 m2 @ 15 | |||
Protective installation | 1,198,000 | 10.11 | 3.70% |
Extension of sprinkler installations into office areas (one head per 9 m2) 74,880 m2 @ 16 | |||
Special installations | 824,000 | 6.96 | 2.55% |
Extension of building management system into office areas74,880 m2 @ 11 | |||
Builder’s work in connection | 503,000 | 4.25 | 1.56% |
Allowance for associated builder’s work (say 4% of services costs)Item @ 503,000 | |||
Preliminaries and contingencies | 5,550,000 | 46.86 | 17.16% |
Construction manager’s preliminaries, staff costs, | |||
overheads and profit (allow 15%) Item @ 4,000,000 | |||
Design reserve and construction contingency (allow 5%)Item @ 1,550,000 | |||
Total for category A fit-out | 32,341,000 | 273.03 | 100% |