- ºÃÉ«ÏÈÉúTV
All the latest updates on building safety reformRegulations latest
- Focus
- Comment
- Programmes
- CPD
- ºÃÉ«ÏÈÉúTV the Future
- Data
2024 events calendar
ºÃÉ«ÏÈÉúTV Awards
Keep up to date
- ºÃÉ«ÏÈÉúTV Boardroom
All the latest updates on building safety reform
2024 events calendar
ºÃÉ«ÏÈÉúTV Awards
Keep up to dateIndicative building costs | |||
Ìý | Low rise £/m2 | Medium rise £/m2 | High rise £/m2 |
Basic speculative offices | |||
Non air-conditioned | 450-630 | 560-770 | 670-920 |
Air-conditioned | 550-760 | 650-930 | 900-1150 |
High quality speculative offices | |||
Non air-conditioned | 600-900 | 700-1050 | - |
Mixed-mode ventilated | 950-1250 | 1050-1350 | 1150-1500 |
Air-conditioned | 750-1050 | 850-1300 | 1000-1450 |
Prestige office buildings | |||
- | 1100-1325 | 1350-1800 | |
Costs are at outer London price levels for August 1996 (DL&E outer London tender index of 262). | |||
Costs of demolitions, external works and enabling works are excluded |
Cost breakdown | |||
Ìý | Element cost (£) | £/m2 gfa (£) | % of total cost |
Substructure | 295 900 | 29.01 | 3 |
Reinforced insitu concrete raft foundations, insulation and waterproofing | Ìý | 2775 m2 @ | £105 |
300 mm high reinforced insitu concrete perimeter upstand, insulation and damp proofing | Ìý | 225 m @ | £20 |
Frame and upper floors | 1 002 700 | 98.3 | 10.18 |
Reinforced insitu concrete frame and upper floors: 3.5 kN/m2 live load, 450 mm diameter columns, 450 mm thick troughed slabs, average reinforcement 85 kg/m3 | Ìý | 7125 m2 @ | £110 |
300 mm high reinforced insitu concrete perimeter upstand | Ìý | 985 m @ | £20 |
Extra over for 7.5 kN/m2 live loading for plant and storage areas | Ìý | 425 m2 @ | £14 |
Extra for fair-faced finish to circular columns | Ìý | 740 m2 @ | £5 |
Extra for architectural finish to exposed soffits | Ìý | 7125 m2 @ | £15 |
Structural steel framing to lightweight roofing, universal sections | Ìý | 10 t @ | £970 |
Structural steel framing to curtain walling and atrium, rolled hollow sections | Ìý | 50 t @ | £1,200 |
Intumescent paint to structural steelwork | Ìý | 120 m2 @ | £25 |
Additional steelwork framing to plant rooms, risers etc | Ìý | allow | £10 000 |
Roof | 638 300 | 62.58 | 6.48 |
Reinforced insitu concrete frame and roof slab, upstands, average reinforcement content 65 kb/m3 | Ìý | 2250 m2 @ | £100 |
Extra for 7.5 kN/m2 live loading for plant rooms | Ìý | 300 m2 @ | £14 |
Extra for fair-faced finish to circular columns | Ìý | 250 m2 @ | £5 |
Extra for architectural finish to exposed soffits | Ìý | 2250 m2 @ | £15 |
Inverted roof coverings, single-ply membrane, rigid sheet insulation, ballast, including allowances for upstands, kerbs etc | Ìý | 2250 m2 @ | £45 |
Atrium glazing: sealed double-glazed units, monopitch configuration, automatic opening vents for natural ventilation control | Ìý | 290 m2 @ | £350 |
Roof-level solar shading to atrium, aluminium aerofoil sections with fixed pitch | Ìý | 215 m2 @ | £300 |
Lightweight raised seam aluminium roofing, secondary supports, insulation, vapour barrier and sheet lining, accessories | Ìý | 490 m2 @ | £90 |
Rainwater goods, aluminium gutters and concealed downpipes | Ìý | 2775 m2 @ | £10 |
Access gantries for atrium maintenance and cleaning, including balustrades and handrails | Ìý | item @ | £25 000 |
Mansafe system for roof access to atrium | Ìý | item @ | £10 000 |
Stairs | 144 800 | 14.2 | 1.47 |
Atrium feature stairs; steel framing, limestone treads, powder-coated finish, armoured glass balustrade, hardwood handrail | Ìý | 3 flights @ | £12 000 |
Escape stairs: precast concrete, granolitihic finishes, mild steel handrails and balustrades | Ìý | 18 flights @ | £4,000 |
Access stairs, catwalks and platforms to plant rooms and roof levels | Ìý | item @ | £20 000 |
15 mm armoured plate glass balustrade and hardwood handrail at permieter of atrium | Ìý | 35 m @ | £480 |
External walls and windows | 2 055 900 | 201.56 | 20.88 |
Double-glazed curtain walling, insulated aluminium framing, mechanically operated clerestory opening lights, manually operated opening lights, ceramic fritting, aluminium spandrel panels | Ìý | 4050 m2 @ | £320 |
Double-glazed curtain walling to atrium at high level, insulated aluminium framing, mechanically operated opening lights | Ìý | 165 m2 @ | £300 |
Double-glazed Planar frameless glazing to entrance lobby, structural steel support | Ìý | 80 m2 @ | £450 |
Aluminium composite solar shading and light shelf, fixed vanes, support steelwork and bracing | Ìý | 1100 m2 @ | £200 |
Flat aluminium composite cladding panels, cladding rails, insulation, 150 mm blockwork backing wall including accessories and wind bracing to plant rooms | Ìý | 300 m2 @ | £140 |
Composite masonry walling: handmade facing brickwork (bricks @ £450 per 1000), insulation, 140 mm blockwork inner leaf, ties, wind bracing, closers, head restraint | Ìý | 3185 m2 @ | £110 |
Aluminium copings, flashings and perimeter details to curtain walling system | Ìý | 400 m @ | £50 |
Reconstituted limestone copings, cappings and string courses to masonry walling | Ìý | 300 m @ | £50 |
Louvres to plant rooms and intakes | Ìý | 150 m2 @ | £180 |
External doors | 54 800 | 5.37 | 0.55 |
Revolving doors to entrance lobby, in glass enclosure | Ìý | 2 @ | £18 000 |
Fully glazed double doors to entrance lobby | Ìý | 2 @ | £4,000 |
Escape doors: insulated powder-coated steel doors and frames, stainless steel and aluminium ironmongery | Ìý | 4 @ | £900 |
Internal partitions | 741 500 | 72.7 | 7.53 |
140 mm thick solid blockwork, fair-faced work, including accessories | Ìý | 2550 m2 @ | £25 |
Metal stud partition: two layers 12.5 mm plasterboard both sides, insulation, skim coate | Ìý | 880 m2 @ | £35 |
Metal stud partition, shaftwall construction, 19 mm core board, two layers 12.5 mm plasterboard one side, skim coat | Ìý | 850 m2 @ | £50 |
Glazed aluminium-framed screens to atrium perimeter, mechanically operated opening lights linked to building management system | Ìý | 1650 m2 @ | £280 |
Frameless, toughened, silicone-jointed glass enclosure to lifts | Ìý | 320 m2 @ | £350 |
Plastic laminate finish WC cubicles and doors | Ìý | 56 @ | £350 |
Plastic laminate finish full-height ductcasing, IPS or similar | Ìý | 90 m @ | £120 |
Internal doors | 99 800 | 9.78 | 1.01 |
Veneer-faced solid core doors, fire resisting vision panels, stainless steel ironmongery | Ìý | 50 @ | £800 |
Ply-faced solid core doors for painting, satin anodised aluminium ironmongery | Ìý | 58 @ | £600 |
Allowance for riser access doors and panels | Ìý | item @ | £25 000 |
Wall finishes | 49 900 | 4.89 | 0.51 |
Emulsion paint to blockwork/plasterboard | Ìý | 900 m2 @ | £2 |
Plasterboard drylining to blockwork, 12.5 mm wallboard on metal-framed firrings, skim coat | Ìý | 1750 m2 @ | £10 |
Limestone cladding to blockwork partitions in reception area | Ìý | 180 m2 @ | £120 |
Ceramic tiling to WCs | Ìý | 180 m2 @ | £50 |
Floor finishes | 503 800 | 49.39 | 5.12 |
Concrete hardener / dust sealant to raised floor plenum and plant room areas | Ìý | 8400 m2 @ | £2 |
Medium-duty raised floor to office areas, 450 mm high | Ìý | 8100 m2 @ | £30 |
Extra for bridging support to raised floors and factory cutting to tiles for grilles and socket outlets | Ìý | 8100 m2 @ | £18 |
Limestone tiles, sand/cement screed to reception area | Ìý | 175 m2 @ | £100 |
Hardwood flooring to atrium | Ìý | 375 m2 @ | £100 |
Hardwood skirtings | Ìý | 1700 m @ | £8 |
Ceramic non-slip floor tiles to WCs, sand/cement screed | Ìý | 360 m2 @ | £60 |
Coved ceramic skirting to WC areas | Ìý | 300 m @ | £10 |
Entrance mats and frames | Ìý | item @ | £5,000 |
Ceiling finishes | 76 400 | 7.49 | 0.78 |
Paint finish to exposed soffit of troughed slab, sealer and masonry paint | Ìý | 14 900 m2 @ | £3.50 |
Suspended ceilings to WC areas | Ìý | 430 m2 @ | £25 |
Plasterboard feature ceiling to reception/public areas | Ìý | 135 m2 @ | £100 |
Fittings, fixtures and furniture | 59 800 | 5.86 | 0.61 |
Reception desk | Ìý | item @ | £20 000 |
Vanity units | Ìý | 8 @ | £600 |
Manually operated window blinds to office areas | Ìý | 1100 m2 @ | £30 |
Mirrors | Ìý | item @ | £2,000 |
6 nr catering sinks for kitchen area | Ìý | allow | £2,500 |
Sanitary appliances | 70 600 | 6.92 | 0.72 |
Sanitary fittings, basins, WCs, urinals, showers | Ìý | 130 @ | £500 |
Cleaners' sinks | Ìý | 8 @ | £700 |
Services equipment | 153 000 | 15 | 1.55 |
ºÃÉ«ÏÈÉúTV management system, including automatic control of opening lights in external walls and fixed internal partitions, lighting control system | Ìý | 10 200 m2 @ | £15 |
Disposal installations | 61 200 | 6 | 0.62 |
Rainwater disposal, aluminium and plastics pipework | Ìý | 10 200 m2 @ | £2 |
Sanitary disposal, plastics pipework | Ìý | 10 200 m2 @ | £4 |
Water installations | 117 200 | 11.49 | 1.19 |
Copper rising main, boosted cold water, localised hot water heaters | Ìý | 10 200 m2 @ | £11 |
Drinking water | Ìý | item @ | £5,000 |
Space heating and air treatment | 1 206 000 | 118.24 | 12.25 |
Gas installation | Ìý | item @ | £18 000 |
Air-handling plant, refrigeration and heat recovery. Displacement ventilation system to office areas, provision for four-pipe, fan-coil system to cellular space and localised officve areas, ductwork terminated at floor level | Ìý | 10 200 m2 @ | £65 |
Low-temperature hot water heating, finned tube convectors, pipework, insulation, gas-fired boilers | Ìý | 10 200 m2 @ | £42 |
Toilet extract installation | Ìý | 10 200 m2 @ | £3 |
Mechanical smoke extract to atrium | Ìý | 16 500 m3 @ | £4 |
Electrical installations | 808 000 | 79.22 | 8.21 |
Mains supply, high/low voltage intake, transformers, switchgear | Ìý | 10 200 m2 @ | £6 |
Power supply to mechanical plant | Ìý | 10 200 m2 @ | £5 |
Low-voltage distribution in risers to office areas | Ìý | 10 200 m2 @ | £10 |
Small power to landlord's areas | Ìý | 1750 m2 @ | £10 |
Lighting and emergency lighting to landlord's areas | Ìý | 1750 m2 @ | £25 |
Lighting to office areas, purpose-made, low glare fittings, category 2 luminaires providing uplight/downlight illumination to 350 lux, automatic controls | Ìý | 8450 m2 @ | £40 |
Controls to office areas lighting, excluding dimming | Ìý | 8450 m2 @ | £10 |
Standby power, two diesel generators | Ìý | item @ | £110 000 |
Lift installation | 230 000 | 22.55 | 2.34 |
Thirteen-person hydraulic lift, glass car, travel speed 1 m/s, serving four levels (glazed enclosure measured separately) | Ìý | 2 @ | £85 000 |
2000 kg hydraulic goods lift; stainless steel car, serving four levels | Ìý | 1 @ | £60 000 |
Protective installations | 50 600 | 4.96 | 0.51 |
Earthing and bonding | Ìý | 10 200 m2 @ | £2 |
Lightning protection | Ìý | 10 200 m2 @ | £1 |
Dry riser installation | Ìý | item @ | £20 000 |
Communications systems | 61 200 | 6 | 0.62 |
Fire, smoke-detection, alarm and public-address system | Ìý | 10 200 m2 @ | £4 |
Wireways for telephones and structured cable only | Ìý | 10 200 m2 @ | £2 |
Builders work in connection with services | 201 500 | 19.75 | 2.05 |
Associated builders'work: service ducts and risers, holes sleeves, chases, bases, fire stopping etc | Ìý | allow | 7.50% |
Preliminaries and contingencies | 1 164 000 | 114.12 | 11.82 |
Contractor's management and staff, site accommodation and establishment | Ìý | allow | 8% |
Design and reserve and contingency | Ìý | allow | 5% |
Total for shell-and-core construction | 9 846 900 | 965.38 | 100 |
Ìý | Ìý | Ìý | Ìý |
Ìý | Element cost (£) | £/m2 gfa (£) | % of total cost |
DEVELOPER's CATEGORY A FIT-OUT | Ìý | Ìý | Ìý |
(based on net lettable area of 8450 m2) | Ìý | Ìý | Ìý |
Wall finishes | 6 000 | 0.6 | 0.65 |
Emulsion paint to plasterboard partitions and drylining in office areas | Ìý | 3 000 m2 @ | £2 |
Floor finishes | 228 200 | 22.37 | 24.24 |
Carpet tile finish to raised floor tiles (raised floor included in shell and core) | Ìý | 8450 m2 @ | £27 |
Services installation | 50 700 | 4.97 | 5.39 |
Extension of building management system to office areas | Ìý | 8450 m2 @ | £6 |
Space heating and air treatment | 278 500 | 27.3 | 29.58 |
Displacement ventilation installation, distribution ductwork in office area, floor-mounted diffusers, interface, with central building management system | Ìý | 7950 m2 @ | £30 |
Distributive ventilation installations, four-pipe, fan-coil installation to localised areas, distribution ductwork, pipework, fan-coil units, grilles and diffusers, insulation, condensate drainage, controls, interface with central building management system | Ìý | 500 m2 @ | £80 |
Electrical installations | 199 000 | 19.51 | 21.14 |
Small power installation, under-floor distribution, one outlet per 5 m2 of office accommodation | Ìý | 8450 m2 @ | £20 |
UPS installation | Ìý | item @ | £30 000 |
Communication systems | 67 600 | 6.63 | 7.19 |
Final connections of fire, smoke-detection, alarm and public-address systems in office areas | Ìý | 8450 m2 @ | £8 |
Preliminaries and contingencies | 111 200 | 10.9 | 11.81 |
Contractor's management and staff, site accommodation and establishment | Ìý | allow | 8% |
Design reserve and contingency | Ìý | say | 5% |
Total for developer's category A fit-out | 941 200 | 92.28 | 100 |
Ìý | Ìý | Ìý | Ìý |
Total construction cost (excluding external works) | 10 788 100 | 1057.66 | - |
Ìý | Ìý | Ìý | Ìý |
Alternative element specifications | Ìý | Ìý | Ìý |
Ìý | Net extra / (saving) £/m2 gfa | Ìý | Ìý |
Substructure | Ìý | Ìý | Ìý |
Construction of basement car park in lieu of raft foundation, reduced level dig, insitu concrete loadbearing structure, drop head columns 2775m2 @ £190 | 58.6 | Ìý | Ìý |
Frame and upper floors | Ìý | Ìý | Ìý |
Composite frame construction: Slimfloor system, structural steel framing with welded plates to top and bottom flanges, precast floor slabs (extra over cost includes suspended ceiling) 7125 m2 @ £80 | -7.92 | Ìý | Ìý |
Extra over cost of white concrete for exposed floor and roof slabs in lieu of ordinary Portland cement concrete 2800 m2 @ £100 | 31.1 | Ìý | Ìý |
Roof | Ìý | Ìý | Ìý |
Two-coat asphalt roofing, vapour barrier, ballast 2250 m2 @ £35 | -2.5 | Ìý | Ìý |
Grass roof, vapour barrier, waterproofing membrane, roof barrier, drainage board, insulation, top soil and seed, including allowance for perimeter balustrading, (120 m @ £100) 500 m2 @ £125 | 4.45 | Ìý | Ìý |
External walls | Ìý | Ìý | Ìý |
Portland stone cladding on precast concrete units, with blockwork backing wall, in lieu of composite masonry walling 3185 m2 @ £380 | 95.6 | Ìý | Ìý |
Double-glazed curtain walling, composite aluminium and softwood framing, manual and mechanically operated opening lights, in lieu of aluminium-framed curtain walling 4050 m2 @ £270 | -22.5 | Ìý | Ìý |
Triple-glazed indirectly openable curtain walling, sealed double-glazing units with opening lights, fully glazed wind shield, insulated glass with ceramic fritting, in lieu of aluminium-framed curtain walling 4050 m2 @ £700 | 171.1 | Ìý | Ìý |
Ceiling finishes | Ìý | Ìý | Ìý |
Suspended ceiling in lieu of exposed soffit of troughed slab with high-quality finish 8800 m2 @ £35 | 19.57 | Ìý | Ìý |
Space, heating and air treatment | Ìý | Ìý | Ìý |
Chilled ceiling installation to office areas, 70% active cooling panels 8450 m2 @ £180 | 65.76 | Ìý | Ìý |
Four-pipe, fan-coil air-conditioning installation to office areas (extra over cost includes suspended ceiling) 8450 m2 @ £130 | 48.89 | Ìý | Ìý |
Regional variations | |
All costs are based on a scheme located in South-East England and should be adjusted using the following location factors for schemes in other regions: | |
Inner London | 1.09 |
Outer London | 1.03 |
South-West | 0.94 |
East Midlands | 0.92 |
West Midlands | 0.93 |
East Anglia | 0.95 |
Yorkshire and Humberside | 0.93 |
North-West | 0.97 |
Northern | 0.94 |
Scotland | 0.97 |
Wales | 0.92 |
Northern Ireland | 0.79 |
Site powered by