Lighting levels | Ìý | Ìý |
General classrooms | Ìý | Ìý300 lux at the work surface |
Lighting for visually demanding work | Ìý | Ìý500 lux at the work surface |
Temperature levels | Ìý | Ìý |
Minimum | Ìý | Ìý |
Ìý | classrooms, libraries and so on | Ìý18°C |
Ìý | circulation areas, gymnasia and so on | Ìý15°C |
Maximum | Ìý | Ìýtemperatures in excess of 28°C are acceptable on 10 days of the year |
Ventilation | Ìý | Ìý |
Background ventilation, occupied areas | Ìý | Ìý3 litres/pupil/second |
Additional capability, teaching areas | Ìý | Ìý8 litres/pupil/second |
Ventilation to washrooms | Ìý | Ìý6 air changes/hour |
Indicative floor areas (11-16 year secondary school) | ||||
Number of pupils | Teaching Area Requirement (m2) | Non-Teaching Area Requirement (m2) | Gross Area Requirement (m2) | Gross Area per Pupil (m2) |
900 | 3600-4000 | 2500-2700 | 6100-6700 | 6.8-7.4 |
1200 | 4500-5100 | 3200-3400 | 7700-8500 | 6.4-7.1 |
1500 | 5600-6200 | 3800-4200 | 9400-10400 | 6.3-6.9 |
1800 | 6600-7300 | 4400-4900 | 11000-12000 | 6.1-6.8 |
Source: DfEE |
Indicative proportions of non-teaching accommodation | ||
Non-teaching space | % total non-teaching area | % gross area |
Staff and administration | 13-14 | 5.2-5.6 |
Pupils' storage and washrooms | Oct-13 | 4.0-5.2 |
Teaching storage | 13-15 | 5.2-6.0 |
Catering | Oct-15 | 4.0-6.0 |
Ancillary areas | 03-Jun | 1.2-2.4 |
Circulation and partitions | 44-48 | 17.6-19.2 |
Total non-teaching area | Ìý | 40 |
Source: DfEE |
Indicative furniture/equipment costs | |
Teaching Space | Cost of furniture and equipment (£/m2 net internal area) |
General teaching | 100-155 |
Laboratories | 130-220 |
IT and business studies | 285-400 |
Design and technology | 275-310 |
Art and design | 185-215 |
Library resource centre | 310-350 |
Circulation | 30-50 |
Laboratory preparation | 285-325 |
Staff accommodation | 330-350 |
Source: Dfee |
Cost model schemes: key features | ||
ºÃÉ«ÏÈÉúTV type | Gross internal floor area (m2) | Cost (building only) (£/m2) |
Classroom block | 2600 | 624.55 |
Technology block | 960 | 751.37 |
Performing arts building | 900 | 1 284.90 |
Sports hall | 1 760 | 865.9 |
Secondary school and college building construction costs and school building efficiency | ||||||
Ìý | Average £/m2 | Lower range £/m2 | High range £/m2 | Usable space / gfa | Usable space and circulation / gfa | Average overall cost/m2 usable space |
Classroom blocks | 670 | 590 | 730 | 0.71 | 0.88 | 940 |
Laboratories | 820 | 600 | 900 | 0.82 | 0.94 | 1000 |
Craft, design and technology | 810 | 670 | 900 | 0.79 | 0.85 | 1030 |
Music | 1000 | 910 | 1050 | 0.77 | 0.87 | 1300 |
Sixth-form / tertiary | 860 | 670 | 1030 | 0.74 | 0.9 | 1160 |
All secondar schools and colleges | 760 | 630 | 910 | 0.77 | 0.89 | 990 |
Costs are for building only and exclude furniture and wquipment, external works, professional fees and VAT. Costs are at February 1998 prices based on locations in south-east England. Usable space as defined by the RICS is the total area of all enclosed space that fulfils the main functional requirements of a building. This includes teaching and non-teaching space but excludes cloakrooms, WCs and plant rooms. |
Cost breakdown for classroom block | |||
Ìý | Element cost (£) | Cost /m2 gfa (£) | % of total cost |
Substructure | 143 000 | 55 | 8.81 |
Reinforced insitu concrete foundations and ground slab; brick-and-block cavity walls to dpc; dpc and polythene vapour barrier | Ìý | 1300 m2 @ | £110 |
Frame | 51 000 | 19.62 | 3.14 |
Fabricated structural steel; grade 43; surface finishes; preparation, intumescent paint and enamel top coat | Ìý | 30 t @ | £1,600 |
Extra for hollow sections | Ìý | 6 t @ | £500 |
Upper floors | 189 000 | 23.77 | 3.82 |
Contractor-designed beam-and-block upper floor construction | Ìý | 1300 m2 @ | £28 |
Timber suspended floor; plywood sheathing | Ìý | 150 m2 @ | £38 |
Roof | 475 800 | 59.85 | 9.63 |
Reconstituted stone slate; structural timber; contractor-designed roof trusses; felt and battens; lead-sheet flashing and gutters; vapour barrier; insulation | Ìý | 1600 m2 @ | £60 |
Laminated timber structural members; flame-resistant clear finish | Ìý | 175 m2 @ | £52 |
Single-layer plastic roofing; structural timber; plywood decking; insulation | Ìý | 170 m2 @ | £50 |
Opening rooflights; Velux; 780 x 1340 mm | Ìý | 2 m2 @ | £720 |
Rainwater goods; plastic gutters and downpipes | Ìý | 320 m @ | £13 |
Stairs | 12 800 | 4.92 | 0.79 |
Contractor-designed precast concrete stairs and half-landings; two flights | Ìý | Item @ | £2,400 |
Insitu concrete steps and stairs; three flights | Ìý | Item @ | £1,800 |
Isolated balustrades; mild-steel handrail; ash-veneer panel | Ìý | 18 m @ | £210 |
Isolated balustrades; mild-steel handrail and balustrades | Ìý | 26 m @ | £115 |
Isolated handrails; mild-steel handrail, average 50 mm diameter | Ìý | 25 m @ | £72 |
External walls | 112 300 | 43.19 | 6.92 |
Cavity-wall construction; facing brick; fairface blockwork; insulation | Ìý | 1084 m2 @ | £80 |
Allowance for pre-cast concrete sills; lintels; thresholds | Ìý | Item @ | £21 000 |
Sheet cladding; plywood and lead; timber subframe; insulation; clear finish | Ìý | Item @ | £4,600 |
Windows and external doors | 80 500 | 30.96 | 4.96 |
Steel-framed, double-glazed windows and doors; powder finish | Ìý | 230 m2 @ | £350 |
Internal walls and partitions | 54 500 | 20.96 | 3.36 |
Partitions; 140 mm solid/hollow dense aggregate facing blockwork | Ìý | 2840 m2 @ | £18 |
Cubicle partitions; laminated plastics | Ìý | 11 @ | £310 |
Internal doors | 78 900 | 30.35 | 4.86 |
Flush doors; solid-core; hardwood-veneer facings; factory lacquer finish; wrot softwood frame; 30/30 fire resistance; stainless steel door furniture | Ìý | 126 @ | £550 |
Vision panels; 200 x 1200 mm; forming openings, glazing beads; Georgian wired glass | Ìý | 79 @ | £40 |
Wrot softwood and hardwood glazed screens; fire-resistant glazing | Ìý | 28 m2 @ | £230 |
Wall finishes | 37 200 | 14.31 | 2.29 |
Drylining; plasterboard; skim coat; softwood framing; decoration | Ìý | 995 m2 @ | £14 |
Sand-cement render; 10 mm thick; galvanised steel beads; ceramic tiling | Ìý | 175 m2 @ | £41 |
Painting blockwork; 1 mist, 3 full coats emulsion | Ìý | 5362 m2 @ | £3 |
Floor finishes | 107 600 | 41.38 | 6.63 |
Carpet; RIW damp-proof membrane; sand-cement screed 75 mm thick; reinforcement; sound insulation to upper floors; skirtings to limited areas | Ìý | 2450 m2 @ | £41 |
Sheet vinyl flooring; sand-cement screed 75 mm thick; reinforcement | Ìý | 90 m2 @ | £50 |
Mats and matwells; stainlesss steel frame; coir matting | Ìý | Item @ | £2,600 |
Ceiling finishes | 41 900 | 16.12 | 2.58 |
Suspended linings; battens; 12.5 mm plasterboard; decorations | Ìý | 480 m2 @ | £27 |
Suspended linings; battens; 19 mm plank and 12.5 mm plasterboard; skim coat; decorations | Ìý | 935 m2 @ | £31 |
Furniture and fittings | 69 100 | 26.58 | 4.26 |
Whiteboards; 2400 x 1200 mm | Ìý | 40 @ | £220 |
Projection screens; 1800 x 1800 mm | Ìý | 30 @ | £280 |
Pinboards | Ìý | 850 m2 | £³æ15 |
Worktops; beech-veneered and lipped chipboard; mild-steel framing | Ìý | 185 m2 | £58 |
Allowance for shelving | Ìý | Item @ | £28 400 |
Sanitary fittings | 15 000 | 5.77 | 0.92 |
WCs, urinals, washhand basins, fittings; laminated plastic duct panels | Ìý | 33 @ | £430 |
Extra for fittings for disabled WCs | Ìý | 2 @ | £150 |
Cleaners' sinks | Ìý | 2 @ | £230 |
Disposal installations | 20 800 | 8 | 1.28 |
Waste, soil and vent installation; PVCu pipework and fittings | Ìý | 2600 m2 @ | £8 |
Water installations | 41 600 | 16 | 2.56 |
Mains water; cold-water storage and distribution, hot-water calorifier, pumps and distribution pipework | Ìý | 2600 m2 @ | £16 |
Space heating & air treatment | 127 400 | 49 | 7.85 |
Heating installation; gas supply, boilers, pumps, distribution, flue | Ìý | 2600 m2 @ | £20 |
Space heating; LPHW distribution; radiators, mild-steel pipework | Ìý | 2600 m2 @ | £29 |
Electrical installations | 140 000 | 54 | 8.65 |
Mains and sub-mains installation | Ìý | 2600 m2 @ | £11 |
Small power installation | Ìý | 2600 m2 @ | £11 |
Lighting and general luminaires | Ìý | 2600 m2 @ | £32 |
Lift installations | 286 000 | 35.97 | 5.79 |
Four-person electro-hydraulic lift serving 2 nr floors; 0.4 m/s | Ìý | Item @ | £18 300 |
Protective installations | 8 000 | 3.08 | 0.49 |
Lightning protection | Ìý | item @ | £6,000 |
Earthing and bonding | Ìý | item @ | £2,000 |
Communications installations | 41 800 | 16.08 | 2.57 |
Analogue fire alrm installation; smoke detectors; call points | Ìý | 2600 m2 @ | £6 |
Telephone and data wireways; dado trunking; TV outlets | Ìý | 2600 m2 @ | £3 |
Class change system | Ìý | item @ | £2,800 |
Security installation; intruder detection; CCTV and so on | Ìý | 2600 m2 @ | £6 |
Special installation | 26 00 | 10 | 1.6 |
ºÃÉ«ÏÈÉúTV management system | Ìý | 2600 m2 @ | £10 |
Builder's work in connection | 22 000 | 8.46 | 1.35 |
Forming holes, chases and so on: allows 5% | Ìý | Item @ | £22 000 |
Preliminaries and contingencies | 211 800 | 81.46 | 13.04 |
Management costs; site establishment and supervision: allow 10% | Ìý | Item @ | £141 200 |
Contingency sum: allow 5% | Ìý | Item @ | £70 600 |
Total construction cost - building only | 1 623 800 | 624.55 | 100 |
Cost breakdown for technology block | |||
Ìý | Element cost (£) | Cost /m2 gfa (£) | % of total cost |
Substructure | 54 700 | 56.98 | 7.58 |
Reinforced insitu concrete ground beams and ground slab; brick-and-block cavity walls to dpc; dpc and polythene vapour barrier | Ìý | 290 m2 @ | £130 |
Rotary bored, cast-in-placepiles; disposal; 300 average diameter | Ìý | Item @ | £17,000 |
Frame | 95 000 | 98.96 | 13.17 |
Fabricated sturcutral steel; including surface treatments | Ìý | 60 t @ | £1,200 |
Insitu concrete; column casing; white concrete; fine smooth finish | Ìý | 28 m @ | £270 |
Drylining; beam casings; proprietary encasing system | Ìý | 498 m @ | £31 |
Upper floors | 20 800 | 21.67 | 2.88 |
Composite upper floor construction; insitu concrete on permanent steel formwork | Ìý | 630 m2 @ | £33 |
Roof | 36 500 | 38.02 | 5.06 |
Vaulted alumnium profiled roof cladding; steel decking; thermal and acoustic insulation; vapour barrier; concealed gutter (area measured on plan) | Ìý | 390 m2 @ | £85 |
Allowance for insitu concrete flat roof to plant area | Ìý | item @ | £2,500 |
Plastic rooflights; 1200 x 1200 mm | Ìý | 1 @ | £800 |
Stairs | 12 300 | 12.81 | 1.71 |
Insitu concrete stairs and half landings; 1300 mm wide | Ìý | 10 m @ | £230 |
Balustrades and handrails; 1.35 m average height; stainless steel | Ìý | 25 m @ | £400 |
External walls | 50 100 | 52.19 | 6.95 |
Curtain walling; thermally insulated stick system; aluminium-faced composite infill panels; anodised aluminium finish | Ìý | 110 m2 @ | £190 |
Cavity-wall; facing brick; 100 mm thick blockwork; insulation | Ìý | 290 m2 @ | £80 |
Allowance for pre-cast concrete sills; lintels; thresholds | Ìý | item @ | £1,900 |
Plywood cladding, timber subframe; insulation, clear finish | Ìý | item @ | £2,100 |
Glass-block screen to staircase | Ìý | 7 m2 @ | £290 |
Windows and external doors | 52 000 | 54.17 | 7.21 |
Steel-frame windows; W20 sections; double-glazed units; powder finish | Ìý | 21 m2 @ | £390 |
Aluminium-frame, double-glazed windows; anodised finish | Ìý | 62 m2 @ | £440 |
Aluminium-frame doors and frames; double glazin; anodised finish | Ìý | 5 @ | £3,300 |
Internal walls and partitions | 19 300 | 20.1 | 2.68 |
Partitions; 100 mm solid dense aggregate common blockwork | Ìý | 600 m2 @ | £21 |
Screens and lights; single-glazed screens; polyester powder coating | Ìý | 30 m2 @ | £200 |
Duct panels; laminated plastic sheet; 2500 mm high | Ìý | 4 m @ | £180 |
Internal doors | 21 600 | 22.5 | 2.99 |
Doors; solid core; MDF facings and frameset; non fire-rated; door furniture | Ìý | 39 @ | £460 |
Extra for 30/30 fire-rated doors and frames | Ìý | 32 @ | £50 |
Extra for vision panels; 300 x 500 mm; Georgian wired glass | Ìý | 10 @ | £50 |
Extra for side screens; average 400 x 2300 mm; Georgian wired glass | Ìý | 6 nr @ | £260 |
Wall finishes | 11 600 | 12.08 | 1.61 |
Two coats plaster, 13 mm; emulsion paint | Ìý | 1184 m2 @ | £9 |
Sand-cement render, 10mm; galvanised-steel lathing; masonry paint | Ìý | 28 m2 @ | £33 |
Floor finishes | 39 400 | 41.04 | 5.4 |
Sheet rubber flooring; sand-cement screed 75 mm average thick; reinforcement | Ìý | 821 m2 @ | £45 |
Extra for work to stairs | Ìý | 99 m2 @ | £5 |
Epoxy floor paint; plant areas | Ìý | 60 m2 @ | £15 |
Matwells | Ìý | Item @ | £1,030 |
Ceiling finishes | 14 300 | 14.9 | 1.98 |
Suspended ceiling; 12.5 mm plasterboard on M/F; 150-500 mm suspension; skim coat; decorations | Ìý | 511 m2 @ | £23 |
Two coats plaster, 13 mm thick; emulsion paint | Ìý | 44 m2 @ | £32 |
Cement lim render; 20 mm thick; lathing; masonry paint | Ìý | 25 m2 @ | £46 |
Furniture and fittings | 16 200 | 16.88 | 2.25 |
Window blinds | Ìý | 52 m2 @ | £24 |
Worktops with storage cupboards; pupose-made; Antium work surface; laminate faced MDF cupboards | Ìý | 20 m @ | £500 |
Allowance for damp cupboards and shelving | Ìý | Item @ | £5,000 |
Sanitary fittings | 900 | 0.94 | 0.13 |
WCs; washhand basins, fittings; complete | Ìý | 4 nr @ | £230 |
Disposal installations | 7700 | 8.02 | 1.07 |
Waste, soil and vent installation; PVCu pipework and fittings | Ìý | 960 m2 @ | £8 |
Water installations | 15 400 | 16.04 | 2.13 |
Mains water; water pumps, storage and distribution pipework | Ìý | 960 m2 @ | £16 |
Space heating and air treatment | 47 000 | 48.96 | 6.52 |
Heating installation; gas supply, boilers, pumps, distribution, flue dilation | Ìý | 960 m2 @ | £20 |
Space heating; LPHW distribution; radiators, mild-steel pipework | Ìý | 960 m2 @ | £29 |
Electrical installations | 51 800 | 53.96 | 7.18 |
Mains and sub-mains installation | Ìý | 960 m2 @ | £11 |
Small power installation | Ìý | 960 m2 @ | £11 |
Lighting and general luminaires | Ìý | 960 m2 @ | £32 |
Lift installation | 21 700 | 22.6 | 3.01 |
Four-person electro-hydraulic lift serving 4 nr floors; 0.4 m/s | Ìý | Item @ | £21 700 |
Protective installations | 4 000 | 4.17 | 0.55 |
Lightning protection | Ìý | Item @ | £3,000 |
Earthing and bonding | Ìý | Item @ | £1,000 |
Communications installation | 34 800 | 36.25 | 4.82 |
Fire alarm; smoke detectors; call points | Ìý | 960 m2 @ | £6 |
Telephone and data wireways; TV outlets to classrooms | Ìý | 960 m2 @ | £2 |
Allowance for structured cabling | Ìý | Item @ | £20 000 |
Class change system | Ìý | Item @ | £1,400 |
Security installation; intruder detection, CCTV and so on | Ìý | 960 m2 @ | £6 |
Special installations | 9 600 | 10 | 1.33 |
ºÃÉ«ÏÈÉúTV management system | Ìý | 960 m2 @ | £10 |
Bulder's work in connection | 10 000 | 10.42 | 1.39 |
Forming holes, chases and so on: allow 5% | Ìý | Item @ | £10 000 |
Preliminaries and Preambles | 74 600 | 77.71 | 10.34 |
Management costs, site establishment and supervision: allow 10% | Ìý | Item @ | £49 700 |
Contingency sum: allow 5% | Ìý | Item @ | £24 900 |
Total construction cost - building only | 721 300 | 751.37 | 100 |
Cost breakdown for a performing arts building | |||
Ìý | Element cost (£) | Cost /m2 gfa (£) | % of total cost |
Substructure | 84 700 | 94.11 | 7.32 |
Reinforced insitu concrete foundations and ground slab; cavity walls to dpc; vapour barrier | Ìý | Ìý | Ìý |
Roof | 156 400 | 173.78 | 13.53 |
Sltae pitched and conical roof; proprietary felt flat-roof system; patent glazing; laminated and sawn structural timber; framing; facias, eaves and verges; vapour barriers; rainwater goods. | Ìý | Ìý | Ìý |
Stairs | 2 800 | 3.11 | 0.24 |
Access stairs and cat ladders | Ìý | Ìý | Ìý |
External walls | 78 500 | 87.22 | 6.79 |
190 mm thick dense concrete blockwork; insulation | Ìý | Ìý | Ìý |
Window and external doors | 68 200 | 75.78 | 5.9 |
Purpose-made wrot softwood screens and windows; proprietary steel-framed glazed screen; double glazing; solid-core flush doors; ironmongery | Ìý | Ìý | Ìý |
Internal walls and partitions | 24 800 | 27.56 | 2.15 |
Partitions; 100 mm solid blockwork; plasterboard-faced timber stud partitions; wrot softwood single-glazed screens; WC cubicles | Ìý | Ìý | Ìý |
Internal doors | 36 100 | 40.11 | 3.12 |
Flush doors; solid-core; hardwood-veneer facings; wrot softwood frame-sets, 30/30 and non fire-rated; ironmongery | Ìý | Ìý | Ìý |
Wall finishes | 30 200 | 33.56 | 2.61 |
Two coats plaster; ceramic tiling on sand-cement backing; acoustic panels to auditorium; emulsion paint | Ìý | Ìý | Ìý |
Floor finishes | 50 700 | 56.33 | 4.38 |
Carpet, slate tile, sheet rubber; sand-cement screed; insulation; dpm; skirtings; decorations; matwells | Ìý | Ìý | Ìý |
Ceiling finishes | 14 200 | 15.78 | 1.23 |
Suspended plasterboard linings; decorations; clear finishing to soffit of roof decking | Ìý | Ìý | Ìý |
Furniture and fittings | 107 900 | 119.89 | 9.33 |
Fittings to foyer area; lighting gantry and access platforms; auditorium seating; staging; fixed furniture to classrooms | Ìý | Ìý | Ìý |
Sanitary fittings | 6 700 | 7.44 | 0.58 |
WCs, urinals, washhand basins, fittings and so on; showers; cleaners' sinks | Ìý | Ìý | Ìý |
Mechanical and public health | 149 300 | 165.89 | 12.91 |
Waste, soil and vent installation; mains water; hot-and cold-water storage and distribution, boiler; LPHW space heating; supply, extract and smoke extract ventilation to auditorium; controls | Ìý | Ìý | Ìý |
Electrical installations | 94 600 | 105.11 | 8.18 |
Mains and sub-mains installation; supplies to mechanical plant; small power; lighting and emergency lighting; lightning protection; earthing and bonding; fire alarm; wireways for data and telecoms; intruder detection | Ìý | Ìý | Ìý |
Special installations | 80 000 | 88.89 | 6.92 |
Stage lighting and sound reinforcement installation | Ìý | Ìý | Ìý |
Builder's work in connection | 17 000 | 18.89 | 1.47 |
Ìý | Ìý | Ìý | Ìý |
Preliminaries and contingencies | 150 900 | 167.67 | 13.05 |
Ìý | Ìý | Ìý | Ìý |
Total construction cost - building only | 1 156 400 | 1 284.90 | 100 |
Cost breakdown for sports hall | |||
Ìý | Element cost (£) | Cost /m2 gfa (£) | % of total cost |
Substructure | 82 000 | 46.59 | 5.38 |
Reinforced insitu concrete column bases, strip foundations and ground slab; brick-and-block cavity walls to dpc; dpc and polythene vapour barrier | Ìý | Ìý | Ìý |
Frame | 200 400 | 113.86 | 13.15 |
Fabricated structural steel; grade 43; columns, beams and trusses; cladding rails | Ìý | Ìý | Ìý |
Upper floors | 21 700 | 12.33 | 1.42 |
Reinforced concrete suspended slab; power floating | Ìý | Ìý | Ìý |
Roof | 144 900 | 82.33 | 9.51 |
Contractor-designed aluminium-profiled roof cladding on plywood decking; single-layer plastic roofing on plywood decking; aluminium roof lights | Ìý | Ìý | Ìý |
Stairs | 45 000 | 25.57 | 2.95 |
Precast concrete stairs and landings; Blanc de Bierges and beech treads; galvanised steel balustrades with stainless steel handrails | Ìý | Ìý | Ìý |
External walls | 90 800 | 51.59 | 5.96 |
Cavity-wall construction with handmade racing bricks; rendered blockwork; aluminium/galvanised steel insulated cladding | Ìý | Ìý | Ìý |
Windows and external doors | 128 600 | 73.07 | 8.44 |
Contractor-designed steel-framed, double-glazed windows and screens; powder-coated finish; solid core doors; revolving entrance door | Ìý | Ìý | Ìý |
Internal walls and partitions | 38 600 | 21.93 | 2.53 |
Blockwork paritions; polyester-powder-coated galvanised steel screens with Pyran glazing; laminated WC cubicles | Ìý | Ìý | Ìý |
Internal doors | 42 300 | 24.03 | 2.78 |
Polyester powder-coated glazed door/screen assemblies with Pyran glazing; galvanised steel doors and frames; fire-rated laminate-faced solid-core doors | Ìý | Ìý | Ìý |
Wall finishes | 32 300 | 18.35 | 2.12 |
Lightweight plaster; ceramic tiling on sand cement backing; emulsion paint | Ìý | Ìý | Ìý |
Floor finishes | 80 300 | 45.63 | 5.27 |
Maple-strip floating floor; wood-block flooring; vinyl sheet; barrier matting; ceramic tiles | Ìý | Ìý | Ìý |
Ceiling finishes | 4 600 | 2.61 | 0.3 |
Lightweigh plaster; wallboard and skim coat; decorations | Ìý | Ìý | Ìý |
Furniture and fittings | 76 000 | 43.18 | 4.99 |
Gymnasium and sports hall equipment; bleacher seating; sotrage cupboards and shelving; cloakroom equipment; fittings to reception | Ìý | Ìý | Ìý |
Regional Variations | |
All costs in this model are based on schemes in south-east England and should be adjusted by the following location factors for schemes in other areas. | |
Inner London | 1.07 |
Outer London | 1.01 |
South-west | 0.93 |
East Midlands | 0.91 |
West Midlands | 0.92 |
East Anglia | 0.94 |
Yorkshire and Humberside | 0.91 |
North-west | 0.95 |
Northern | 0.91 |
Scotland | 0.93 |
Wales | 0.9 |
Northern Ireland | 0.8 |