Keep up to dateNew build supermarket with 50,000 ft2 sales area | |||
Ìý | element cost | cost/m2 gfa £ | % of total cost |
Supermarket shell | Ìý | Ìý | Ìý |
Substructure | 348,000 | 46.2151 | 19.26 |
Pad foundations and ground beamsÌý6960 m2 @ £15 | |||
150 mm reinforced concrete ground floor slab; 175 mm granular fill, powerfloated finish; including formation of below floor ducts to checkout areas onlyÌý6960 m2 @ £35 | |||
Frame | 362,300 | 48.1142 | 20.05 |
Steel propped portal frame, cold rolled purlin sections, surface treatment, excluding decorations; allowance based on 41 kg/m2Ìý286t @ £1,050 | |||
Fire casing to columns and beams under first floor, including cavity barriersÌý570 m2 @ £28 | |||
Structural steel frame to form first floorÌý50t @ £920 | |||
Upper floors | 28,500 | 3.7849 | 1.58 |
Holorib decking and insitu concrete topping to first floorÌý570 m2 @ £50 | |||
Roof | 447,700 | 59.4555 | 24.78 |
Standing seam aluminium roof, curved to 172 m radius, including inner liner trayÌý5500 m2 @ £40 | |||
Eaves detail to roof claddingÌý170 m @ £135 | |||
Single layer polymeric roof covering, built-up system including 85mm insulation board and inner liner tray to flat roof areas to front of storeÌý1640 m2 @ £50 | |||
Allowance for rainwater goods, including syphonic drainage to standing seam roofÌýItem @ £30,000 | |||
Allowance for mansafe system and hatches to flat roofÌýItem @ £15,000 | |||
Profiled metal pvf2 coated cladding to form canopy, including secondary steelwork, flashings and decorationÌý210 m2 @ £370 | |||
Stairs | 20,000 | 2.6560 | 1.11 |
Reinforced concrete stairs to first floor level; galvanised steel balustrade and handrails 2nr @ £10,000 | |||
External walls, windows and doors | 225,200 | 29.9070 | 12.46 |
Profiled galvanised steel built-up cladding system, 120mm quilt insulation with white inner liner sheet; polyester powder coatingÌý890 m2 @ £35 | |||
Feature cladding band to store front and customer restaurant, composite cladding system with bonded liner and insulationÌý675 m2 @ £20 | |||
Allowance for louvres, flashings and detailingÌý65 m2 @ £850 | |||
Allowance for column casingsÌýItem @ £10,000 | |||
Polyester powder coated aluminium shopfronts; double glazed with safety glass; including 4nr double manual doors and framesÌý300 m2 @ £310 | |||
Aluminium windows; polysester powder coated; sealed double glazed unitsÌý25 m2 @ £260 | |||
Softwood framed, metal lined external doorsets, including ironmongery and decorationÌý17nr leaves @ £750 | |||
Allowance for shutters to loading bay doorsÌýItem @ £3,000 | |||
Disposal installations | 125,300 | 16.6401 | 6.93 |
Below slab drainage, manholes, covers, etcÌý6960 m2 @ £18 | |||
Protective installations | 4,000 | 0.5312 | 0.22 |
Allowance for lightning protectionÌýItem @ £4,000 | |||
Preliminaries and contingency | 246,000 | 32.6693 | 13.61 |
Contractor's site establishment and supervision @ say 6%ÌýItem @ £94,000 | |||
Contractor's overheads and profit @ say 4%ÌýItem @ £66,000 | |||
Contingency @ say 5%ÌýItem @ £86,000 | |||
TOTAL CONSTRUCTION COST (Shell only, rate based on GIFA) | 1,807,000 | 239.98 | 100.00 |
New build supermarket with 50,000 ft2 sales area | |||
Ìý | element cost | cost/m2 gfa £ | % of total cost |
Supermarket fit-out | Ìý | Ìý | Ìý |
Internal partitions & doors | 237,000 | 31.47 | 4.71 |
Internal metal stud partitions, including sundry metalworkÌý2160 m2 @ £55 | |||
Fire protection / stoppingÌý2160 m2 @ £20 | |||
Carpentry and joinery including internal doors and frames and trucking doorsÌýItem @ £50,000 | |||
Security and fire shutters generallyÌýItem @ £25,000 | |||
Internal finishes | 338,200 | 44.91 | 6.72 |
300 x 300 terrazzo flooring to sales areaÌý5100 m2 @ £35 | |||
Checkout duct coversÌýItem @ £25,000 | |||
Allowance for Aluminium access covers and framesÌýItem @ £5,000 | |||
150 x 150 white wall tiles to bakery, including epoxy groutÌý440 m2 @ £32 | |||
150 x 150 ceramic floor tiles to bakery, prep areas, serveries and WC's, including epoxy grout, skirtings, angles, etcÌý540 m2 @ £45 | |||
Vinyl sheet flooring to back-up areas, including skirtings, trims, DPMÌý425 m2 @ £48 | |||
Allowance for other miscellaneous wall / floor finishesÌýItem @ £25,000 | |||
Suspended ceilings to domestic areas and customer WC'sÌý465 m2 @ £45 | |||
Allowance for insitu finishes, including screeding, etcÌýItem @ £25,000 | |||
Fittings and equipment | 1,309,000 | 173.84 | 26.01 |
Allowance for internal signageÌýItem @ £18,000 | |||
Allowance for trolley protection railsÌýItem @ £20,000 | |||
Allowance for ATM / cash officeÌýItem @ £30,000 | |||
Specialist joinery to create front brand wallÌýItem @ £20,000 | |||
Shopfitting to PharmacyÌýItem @ £30,000 | |||
Allowance for gondolas to sales floor generallyÌý4,645 m2 @ £38 | |||
Servery, plant and equipment to bakeryÌýItem @ £260,000 | |||
Shopfitting to specialist areas including hot food, deli, meat and fish, salad bar, etcÌýItem @ £130,000 | |||
Allowance for checkouts (not including service desk and kiosk)Ìý30nr @ £3,000 | |||
Allowance for miscellaneous shopfitting/specialist items, etcÌýItem @ £150,000 | |||
Fitting out to customer restaurant (excluding catering equipment)Ìý300 m2 @ £835 | |||
Fitting out to staff WCsÌýItem @ £16,000 | |||
Fitting out to staff dining roomÌýItem @ £45,000 | |||
Allowance for fit-out to staff offices / meeting room / training roomÌýItem @ £15,000 | |||
Allowance for racking to bulk stock areasÌýItem @ £50,000 | |||
CompactorÌýItem @ £8,000 | |||
Water installations | 30,000 | 3.98 | 0.59 |
Allowance for plumbing and water installationÌýItem @ £30,000 | |||
Services equipment | 734,800 | 97.58 | 14.60 |
Refrigeration distribution installation complete; including pipework and installationÌýItem @ £150,000 | |||
Refrigeration plant, including packs and condensers (2nr 200kW dual temperature systems)ÌýItem @ £140,000 | |||
Refrigeration cabinets to shopfloor, including mixture of full height glass door cabinets, opentop cabinets, etcÌý4,645 m2 @ £85 | |||
Packaged coldstores including controls, etcÌýItem @ £50,000 | |||
Space heating, air treatment and ventilation | 468,900 | 62.27 | 9.32 |
Ventilation ductwork including insulation, grilles, diffusers, etcÌý7,530 m2 @ £26 | |||
Air treatment plant, air handling units and central boiler plant supplyingÌý18 m2/s at 30degC 7,530 m2 @ £21 | |||
Pipework to heating systemÌýItem @ £95,000 | |||
Allowance for special attenuationÌýItem @ £20,000 | |||
Electrical installation | 507,500 | 67.40 | 10.08 |
Mains and sub-mainsÌý7,530 m2 @ £11 | |||
Trays and trunkingÌý7,530 m2 @ £6 | |||
Small powerÌý7,530 m2 @ £7 | |||
General lighting to sales floor (800-1,000 lux)Ìý4,645 m2 @ £28 | |||
Allowance for feature lighting to sales floorÌý4,645 m2 @ £10 | |||
Back of house lightingÌý2,885 m2 @ £15 | |||
Power to services installations; containmentÌýItem @ £27,000 | |||
Allowance for electrical works to specific departments / customer restaurantÌýItem @ £80,000 | |||
Lift installations | 100,000 | 13.28 | 1.99 |
Allowance for 8 person goods lifts to first floorÌý2nr @ £30,000 | |||
Scissor lift to service yardÌýItem @ £20,000 | |||
Dock levellers / sheltersÌý2nr @ £10,000 | |||
Protective installations | 154,600 | 20.53 | 3.07 |
Allowance for sprinkler installationÌý7,530 m2 @ £20 | |||
Earthing and bondingÌýItem @ £4,000 | |||
Communications installation | 154,400 | 20.50 | 3.07 |
Fire alarm installationÌý7,530m2 @ £8 | |||
Public address systemÌý7,530m2 @ £1 | |||
Telephone installationÌýItem @ £5,000 | |||
Structured cablingÌýItem @ £20,000 | |||
Allowance for CCTV installationÌý19nr @ £1,400 | |||
Security TaggingÌýItem @ £35,000 | |||
Special installations | 270,000 | 35.86 | 5.37 |
BMS / controlsÌýItem @ £85,000 | |||
Allowance for catering equipment to customer restaurant (115 covers)ÌýItem @ £185,000 | |||
Builder's work | 150,000 | 19.92 | 2.98 |
Allowance for builder's work in connection with services say @ 6%ÌýItem @ £150,000 | |||
Preliminaries and contingency | 578,000 | 76.76 | 11.49 |
Contractor's site establishment and supervision @ say 6%ÌýItem @ £267,000 | |||
Contractor's overheads and profit @ say 4%ÌýItem @ £189,000 | |||
Contingency @ say 2.5%ÌýItem @ £123,000 | |||
TOTAL CONSTRUCTION COST (Rate based on GIFA of extended store) | 5,032,400 | 668.30 | 100.00 |
New build supermarket with 50,000 ft2 sales area | |||
Ìý | element cost | cost/m2 gfa £ | % of total cost |
External works | Ìý | Ìý | Ìý |
Site works | 797,000 | 105.84 | 28.98 |
Allowance for site preparationÌý22,000 m2 @ £9 | |||
Tarmac surfacing to car park and access roadÌý13,000 m2 @ £20 | |||
Concrete surfacing to service yardÌý1,200 m2 @ £35 | |||
Paving to front of storeÌý800 m2 @ £40 | |||
Signage and street furnitureÌýItem @ £50,000 | |||
Trolley baysÌýItem @ £5,000 | |||
Allowace for soft landscaping, including topsoilingÌýItem @ £140,000 | |||
Boundary fencingÌýItem @ £70,000 | |||
Drainage | 132,000 | 17.53 | 4.80 |
Allowance for drainage and sewer connectionsÌý22,000 m2 @ £6 | |||
External services | 331,000 | 43.96 | 12.04 |
BWIC underground servicesÌýItem @ £61,000 | |||
External lighting installations including BWICÌý15,000 m2 @ £8 | |||
Allowance for utilities supplies, directs and diversionsÌýItem @ £150,000 | |||
Minor building works | 1,165,000 | 154.71 | 42.36 |
Allowance for stand alone substation/pump house; completeÌýItem @ £15,000 | |||
Allowance for 6 pump PFS, including car wash and jet washÌýItem @ £450,000 | |||
Allowance for kioskÌýItem @ £450,000 | |||
Allowance for section 106 / 278 worksÌýItem @ £250,000 | |||
Preliminaries and contingency | 325,000 | 43.16 | 11.82 |
Contractor's overheads, site establishment and supervision @ say 8%ÌýItem @ £194,000 | |||
Contingency @ say 5%ÌýItem @ £131,000 | |||
TOTAL CONSTRUCTION COST (External works only, rate based on GIFA) | 2,750,000 | 365.20 | 100.00 |
TOTAL CONSTRUCTION COST (Rate based on GIFA) | 9,589,400 | 1,273.48 | Ìý |
Cost breakdown | |||
Ìý | element cost | cost/m2 gfa £ | % of total cost |
Supermarket extension | Ìý | Ìý | Ìý |
Works to existing | 215,000 | 28.33 | 4.20 |
Allowance for repairs and alterations to existing shell, including redecorationÌýItem @ £215,000 | |||
Extension to shell | 1,241,300 | 163.54 | 24.26 |
Extension to rear sales wall including removal of equipment; demolition of existing; pad foundations and floor slab, steel frame, external walls and doors to match existing, tiled roof structure, incorporation of new M&E with existing systems, internal finishesÌý280 m2 @ £690 | |||
Ditto to non-entrance side extensionÌý1,115 m2 @ £940 | |||
Fitting out | 2,575,800 | 339.37 | 50.35 |
Part refurbishment / part new shopfitting to existing sales area and new shopfitting to extended area including M&E worksÌý4,365 m2 @ £535 | |||
Allowance for changes to back-up areasÌýItem @ £175,000 | |||
Internal finishes, branding and signageÌý4,365 m2 @ £15 | |||
External works | 280,000 | 36.89 | 5.47 |
Allowance for external works, including groundworks, foul and surface water drainage, services diversions, fencing, and street furnitureÌýItem @ £280,000 | |||
Preliminaries and contingency | 804,000 | 105.93 | 15.72 |
Contractor's overheads, site establishment and supervision @ say 13%ÌýItem @ £560,000 | |||
Contingency @ say 5% Item @ £244,000 | |||
TOTAL EXTENSION COST (Rate based on GIFA of extended store) | 5,116,100 | 674.06 | 100.00 |
Supermarket refurbishment | Ìý | Ìý | Ìý |
Remedial works / finishes | 1,028,800 | 823.04 | 52.29 |
Removal of existing asbestos contaminated ceiling and replacement with metal tile suspended ceiling; to sales floorÌý1250 m2 @ £130 | |||
Repair and make good existing sales area floor finishes, including overlay with vinyl, 1250 m2 @ £85 | |||
Additional lighting to sales floorÌýItem @ £45,000 | |||
Refrigeration plant / infrastructure costsÌýItem @ £155,000 | |||
Upgrade / remedial works to M&E servicesÌýItem @ £385,000 | |||
Internal finishes, branding and signageÌýItem @ £60,000 | |||
Alteration works to existing customer entranceÌýItem @ £50,000 | |||
Changes to back-up areasÌýItem @ £65,000 | |||
Fitting out | 497,800 | 398.24 | 25.30 |
Refurbishment of store including new and reused shopfittings; associated M&E worksÌý1250 m2 @ £305 | |||
Allowance for new checkoutsÌýItem @ £65,000 | |||
Allowance for new staff restaurant and other back of house worksÌýItem @ £50,000 | |||
External works | 25,000 | 20.00 | 1.27 |
Allowance for limited external worksÌý Item @ £25,000 | |||
Preliminaries and contingency | 416,000 | 332.80 | 21.14 |
Contractor's site establishment and supervision @ 10%ÌýItem @ £155,000 | |||
Additional cost of nightworks and 24hr workingÌýItem @ £50,000 | |||
Allowance for special attendancesÌýItem @ £40,000 | |||
Contractor's overheads and profit @ 4.5%ÌýItem @ £77,000 | |||
Contingency @ say 5%ÌýItem @ £94,000 | |||
TOTAL REFURBISHMENT COST (Rate based on sales floor area) | 1,967,600 | 1,574.08 | 100.00 |