All HS2 articles – Page 13
-
ºÃÉ«ÏÈÉúTV
Getting on with HS2 was right thing to do, minister says
Impact of covid on how many passengers will use railway not yet assessed, Andrew Stephenson adds
-
ºÃÉ«ÏÈÉúTV
HS2 expects 95% of jobs to go to UK firms
Close to 400,000 contracts will be handed out on £100bn project
-
ºÃÉ«ÏÈÉúTV
HS2 unveils details of online meet the contractor event
Initiative taking place later this month
-
ºÃÉ«ÏÈÉúTV
HS2 has more than 300 NDAs in place
Minister in charge of taxpayer-funded scheme defends their use
-
ºÃÉ«ÏÈÉúTV
Protestors hitting HS2's cost and timetable, railway admits
Disruption has intensified since last autumn
-
ºÃÉ«ÏÈÉúTV
HS2 reveals designs for Northamptonshire viaducts
Public consultation underway for two schemes drawn up by civils team EKFB
-
ºÃÉ«ÏÈÉúTV
Enabling works and Euston redesign see HS2 costs spiral by £800m
But minister says extra cash will come from project’s contingency fund
-
ºÃÉ«ÏÈÉúTV
HS2 paid out £165m to Laing O’Rourke JV in first six months of year
Railway shelled out £900m to fims during period, DfT data says
-
ºÃÉ«ÏÈÉúTV
HS2 awards contracts for first two London tunnelling machines
Machines to arrive in the UK by end of next year
-
ºÃÉ«ÏÈÉúTV
Consultation on HS2 design changes begins
Views on northern section alterations sought until 11 December
-
ºÃÉ«ÏÈÉúTV
HS2 vehicles threatened by protesters given permission to remove branding
Railway’s minister Andrew Stephenson says move can be made in ‘exceptional circumstances’
-
ºÃÉ«ÏÈÉúTV
Winner of £260m HS2 modular track contract revealed
Contract will cover work between London and Crewe
-
Comment
Sign the EWS1 form at your peril
The EWS1 form was meant to offer reassurance about fire safety, but in liability terms it’s a death trap for consultants
-
ºÃÉ«ÏÈÉúTV
HS2 flags cyber security risks posed by covid restrictions
Railway's board says remote working calls for different digital protocols
-
ºÃÉ«ÏÈÉúTV
Protest disruption cost HS2 enough to ‘build a primary school’
Price of disruption revealed in HS2 board minutes from a meeting in May
-
ºÃÉ«ÏÈÉúTV
HS2 trials AI to cut carbon emissions
New tech being run on Skanska Costain Strabag sites