All Energy, Infrastructure and Refurbishment articles – Page 45
-
ºÃÉ«ÏÈÉúTV
Welsh government floats return of tidal lagoon schemes
Initiative was pulled by UK government in 2018 amid concerns over costs
-
ºÃÉ«ÏÈÉúTV
British Land sets targets to cut greenhouse gases
Canada Water developer says carbon levies will fund retrofitting work across estate
-
ºÃÉ«ÏÈÉúTV
Work on £500m Oxford life sciences district edges closer to start
Scheme includes new laboratories, offices and homes
-
ºÃÉ«ÏÈÉúTV
Retrofits could cut CO2 emissions from Victorian homes by more than 80%, Historic England says
More than a fifth of buildings in England are over a century old
-
Features
Repurposing non-medical to medical space
Looking for outside the box tenants could be the key to success for commercial clients
-
ºÃÉ«ÏÈÉúTV
Protestors and covid leave HS2 facing further £400m cost hike
Scheme has previously identified £800m overspend on first phase of project
-
ºÃÉ«ÏÈÉúTV
Green light for Southwark orthopaedic centre next door to Shard
Scheme designed by Canadian firm IBI
-
ºÃÉ«ÏÈÉúTV
London will still need Crossrail 2 to deal with HS2 influx, London mayor predicts
Sadiq Khan says he expects mothballed scheme will eventually get built
-
ºÃÉ«ÏÈÉúTV
Green Homes Grant had ‘devastating consequences’ for construction sector, MPs say
Environmental audit committee calls on government to launch national retrofit strategyÂ
-
ºÃÉ«ÏÈÉúTV
Fosters’ plan for Hammersmith Bridge could slash £40m from repair bill
Proposal to open crossing next summer for cyclists and pedestrians
-
ºÃÉ«ÏÈÉúTV
Resource issues and IR35 tax changes another headache for Crossrail, Jacobs warns
Project fighting to staff up scheme in face of competing rivals
-
ºÃÉ«ÏÈÉúTV
Minister says plan to scale back HS2’s Euston station won't harm scheme
Andrew Stephenson says cutting a platform would still allow for all planned services to run
-
ºÃÉ«ÏÈÉúTV
Government launches consultations in non-residential net zero push
BEIS looking for views on performance-based rating framework for large commercial and industrial buildings
-
ºÃÉ«ÏÈÉúTV
Crossrail may need more cash to finish job, consultant warns
Jacobs says risk increasing £825m bailout agreed last December will not be enough
-
ºÃÉ«ÏÈÉúTV
Government unveils £1bn plan to cut industrial emissions
Industrial decarbonisation strategy reveals details of project spending across the countryÂ
-
Features
More questions than answers for national infrastructure bank
While the idea of the new bank has been welcomed across the sector, the devil will be in the detail – which remains largely unknown, Jonathan Owen reports
-
ºÃÉ«ÏÈÉúTV
Firms on notice for £50m Midlands retrofit framework
Dynamic purchasing system is looking for consultants
-
ºÃÉ«ÏÈÉúTV
HS2 starts work on UK’s longest rail viaduct
Grimshaw-designed project will see close to 300 piles sunk to depths of 55m
-
Features
COP26: Time to get ready … the world will be watching
The UN conference on climate change – COP26 – in Glasgow this November will be the largest such gathering ever held in the UK. Its significance in the fight against global warming cannot be overestimated
-
ºÃÉ«ÏÈÉúTV
Teams on mothballed Bakerloo line and Crossrail 2 schemes moved onto other jobs
Work on two projects officially put on hold last week