All Energy, Infrastructure and Refurbishment articles – Page 50
-
ºÃÉ«ÏÈÉúTV
Government in talks to build £20bn Sizewell C nuclear plant
Discussions with EDF come at same time as publication of energy white paper
-
ºÃÉ«ÏÈÉúTV
British Land redraws buildings at Canada Water scheme so gas boilers can be stripped out in future
Developer wants huge £3.3bn project to be fossil fuel free
-
ºÃÉ«ÏÈÉúTV
Construction gets another new minister
Kwasi Kwarteng becomes the fourth in less than two years
-
Features
Countdown to zero: how can the UK meet its 2050 carbon targets?
To have any chance of getting to net zero carbon by 2050, huge efforts will have to be made in reducing emissions from the built environment. Thomas Lane reports on the industry’s response to the challenge
-
ºÃÉ«ÏÈÉúTV
Crown Estate sets 2030 net zero target
Firm commits to being climate positive by end of decade
-
ºÃÉ«ÏÈÉúTV
Farringdon Crossrail station eyes spring handover
Scheme built by team featuring Kier and Bam Nuttall
-
ºÃÉ«ÏÈÉúTV
Probe into costs of major transport jobs launched by MPs
Written evidence due back by 15 January
-
ºÃÉ«ÏÈÉúTV
PM warned on lack of joined-up thinking after latest climate pledge
Boris Johnson wants emissions cut a further 15% by end of decade
-
ºÃÉ«ÏÈÉúTV
Former Heathrow boss drafted in to hospital building programme
Ministers want 40 schemes built by 2030
-
ºÃÉ«ÏÈÉúTV
Government’s green homes initiative feels MPs’ ire
Ministers told about public’s difficulties accessing initiative
-
ºÃÉ«ÏÈÉúTV
Watch: HS2’s demolition of Seifert’s Euston towers reach ground level
Main station contractor Mace Dragados completing final work on 1970s buildings
-
ºÃÉ«ÏÈÉúTV
Critical Crossrail staff kept apart to ensure late-running job not hit with covid delays
Measures put in place to make sure entire teams are not struck down at once with virus
-
ºÃÉ«ÏÈÉúTV
Consultants eyeing framework for £4bn Cambridgeshire metro
Lots to include engineering and design jobs
-
ºÃÉ«ÏÈÉúTV
Government’s proposals for HS2 phase two to be revealed before Christmas
Integrated Rail Plan also expected to unveil details for Northern Powerhouse Rail initiative
-
ºÃÉ«ÏÈÉúTV
Crossrail gets £825m bailout as bill for railway hits £18.6bn
Work on scheme is due to finish in 2022
-
ºÃÉ«ÏÈÉúTV
Government’s chief construction advisor blames dithering ministers for mega-project delays
Comments come as IPA boss said he told Highways England to rethink timetable for £8bn Lower Thames Crossing
-
ºÃÉ«ÏÈÉúTV
UKGBC unveils new net zero guidance
Publication is part of the UKBC’s programme to drive the transition to net zero construction
-
ºÃÉ«ÏÈÉúTV
Crossrail at risk of further delays, Jacobs warns
Crossrail has said spending delays have not slowdowned the programme
-
ºÃÉ«ÏÈÉúTV
Consultants eyeing net zero job for Scottish university
Strathclyde looking to revamp estate to meet green targets
-
ºÃÉ«ÏÈÉúTV
Builders’ merchant sales soar in third quarter
Overall sales up 8.3% in September compared to same month last year