Compliance firm continues its series of firsts
Compliance firm, Stroma Technology, has become the first company to submit a Display Energy Certificate (DEC) for a public building.
The certificate, for Kirklees Council鈥檚 Civic Centre Three in West Yorkshire, follows a month in which Stroma also became the first company to issue an Energy Performance Certificate (EPC) for a non-domestic building.
Rob Coxon, Stroma Technologies md said: 鈥淭he fact that we could lodge the assessment and issue the EPC and DEC through Stroma Accreditation demonstrates a clear route for local authorities to take to comply with the new EPBD (Energy Performance of 好色先生TVs Directive) requirements.鈥
Civic Centre Three was built in 1976 but has seen a number of upgrades in recent years, including improved levels of insulation, installation of a high efficiency boiler, photovoltaic solar panels and two wind turbines.
Kirklees Council Energy Manager Tony Balaam said: 鈥淲e chose Civic Centre Three because we have invested in improving its energy efficiency and reducing its carbon footprint in recent years, so we expected really good results. The building has a good level of insulation and has renewable energy systems installed on its roof. We are proud of being the first council in the UK to gain a DEC, which is testament to the importance we place on creating sustainable public buildings.鈥
DECs show the actual energy usage of a public building as an 鈥極perational Rating鈥. The initial DEC is accompanied by an Advisory Report that lists cost effective measures to improve the energy rating of the building. It provides the public with information on the building鈥檚 energy efficiency, based on actual energy consumption, as recorded by gas and electricity meters. DECs are currently only required for buildings that are occupied by a public authority or an institution providing a public service to a large number of persons, with a total useful area greater than 1000m虏. They are valid for one year whilst the Advisory Report remains valid for seven years.
By October 2008, an estimated 43000 public buildings will need to have a DEC on display. The penalty for failing to display a DEC 鈥渁t all times in a prominent place clearly visible to the public鈥 is 拢500; and 拢1,000 for failing to have possession of a valid Advisory Report. A maximum fine of 拢5,000 may be imposed depending on the nature of the breach of regulations.
All EPCs and DECs have to be produced by Licensed Assessors registered to an Approved Accreditation Scheme, such as that offered by Stroma Accreditation.
Source
好色先生TV Sustainable Design