- ºÃÉ«ÏÈÉúTV
All the latest updates on building safety reformRegulations latest
- Focus
- Comment
- Programmes
- CPD
- ºÃÉ«ÏÈÉúTV the Future
- Data
2024 events calendar
ºÃÉ«ÏÈÉúTV Awards
Keep up to date
- ºÃÉ«ÏÈÉúTV Boardroom
All the latest updates on building safety reform
2024 events calendar
ºÃÉ«ÏÈÉúTV Awards
Keep up to dateComparison of the energy savings afforded by various renewable options and how they translate into CO2 | |||||
Renewable technology | Candidate buildings | Prerequisites | Potential barriers | Annual saving per £100,000 of capital cost | |
kWh | Kg CO2 | ||||
Tower-mounted wind generators | Industrial, distribution centres | Average site wind speed minimum 7 m/s | Environmental impact; site space for large turbines | 100,000 | 43,000 cf electricity |
ºÃÉ«ÏÈÉúTV-mounted micro wind | Most types of building | Average site wind speed minimum 3.5 m/s | Environmental impact; roof space for small turbines. | 40,000 | 17,200 cf electricity |
*Photovoltaic roof or panels | Most types of building | Roughly south-facing, unshaded | Available roof space | 12,500 | 5375 cf electricity |
*Photovoltaic rain screen or glass | Prestige offices or retail | Roughly south-facing, unshaded | None | 9,000 | 3870 cf electricity |
Passive solar water heating | Residential and commercial, hotels and leisure | Roughly south-facing, unshaded; requirement for hot water | None | 50,000 | 9500 cf gas |
Ground source heat pump | Most types of building | Feasible ground conditions | Site space for pipes | 40,000 | 7600 cf gas |
Borehole cooling | Offices, hotel, leisure | Feasible ground conditions | Site space for pipes | 12,000 | 5160 cf electricity |
Biomass boilers | Most types of building | Space, and convenient source of fuel | Environmental impact, and maintenance | 100,000 | 19,000 cf gas |
Biomass CHP | Industrial, hotel, leisure, hospital | Space, and convenient source of fuel requirement for heat in summer | Environmental impact and maintenance | 28,000 + 63,000 | 12,000 cf electricity+ 12,000 cf gas |
* The photovoltaic options indicated include no allowance for the displacement of conventional building fabric, therefore the yield per £100,000 may be higher. The following exclusions relate to all of the above indicative costs: inflation beyond second quarter 2005, maintenance charges, general builders work, main contractor’s overheads, profit and attendance, main contract preliminaries, professional and prescribed fees, contingency and design reserve, grant aid, tax allowances, VAT. Price levels indicated are based on provincial locations. |
Site powered by